Laserfiche WebLink
1 <br /> GROUNDWATER SAMPLING FORM <br /> rL f PROJECT INFORMATION <br /> PROJECT NAME (LA G S �f11 - PROJECT NUMBER 511' MI"'00 WELL NO <br /> PROJECT MANAGER, _jp TYPE OF WELL l/ Monitoring Extraction Cther <br /> RECORDED BY 4 SAMPLED BY 14-F- DATE S 1�O <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> asing Diameter <br /> 2 incn flinch other Bader - Type, <br /> Well Total Depth 'lJ' feet below Top of Casing,TO Pump Type <br /> Other - Speosfy <br /> Depth to Water feet below Top of Casing,WL Hydro on odor; <br /> ` <br /> Water Column Length r feet Yes Na <br /> Purge Volume Calculation (Water Column Length x Multiplier x No volumes = Calculated Purge Volume) <br /> 3-3 X 0 - S -:� X J = 6 2 Calculated Purge Volume = Z allons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = allons <br /> Mulls ller Easf Diametal� cher = �alfoEasll[near foot ��Q#'� 4=tX66 6=1 5 B��.� <br /> Groundwater Parameter Measurement Meter Type / Calibrated _Yes_No <br /> TIME ELAPSED FLOWRATE DTWpH EC TEMP TUR9101TY REDOX COMMENT <br /> ��11 <br /> TIME (GPM) (ft) ❑nhoslcm � (N7U) mV <br /> 6,S" 62,q _Ick 06 <br /> /^0 ro Z _ L_110Ur <br /> 01) <br /> 3. 9 66, 4-37 -7-Z <br /> �r <br /> ENYlRtlNMENTAL,tlEOTECH/I l 1AWASSOAES <br /> I T EI tlN . <br />