Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME USN (14S ¢#!�Q PROJECT NUMBER 54'ZS?IZ Zr03 <br /> WELL NO l+l) 2 <br /> PROJECT MANAGER J TYPE OF WELL V_Monitoring Extraction Other <br /> RECORDED BY SAMPLED BY AF_ <br /> DATE. o',71%()4_ <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well astng Diameter <br /> 2-inch 4-inch Other <br /> 'Aader - Type � <br /> y' Pump - Type <br /> Well Total Depth L feet below Top of Casing,TO other - Specify <br /> Depth to Water 63' 3 feet below Top of Casing,WL Hydrocarbon Odors <br /> ` Yes _1 Na <br /> Water Column Length,Z feet <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> ('11—L X d' X _ = 3 2� Calculated Purge Volume = a _ gallons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = gallons <br /> Multiplier (Cast Diameter Lnchesj = Gallonslimear rootj z=Q#T' 4=0-66 6=1 5 B=ze <br /> Groundwater Parameter Measurement Meter Type _f 3.SO 0 Calibrated V Yes—No <br /> TIME ELAPSED FLOWRATE DTW pH EC TEMP TURBIDITY REDOX COMMS TS <br /> TIME (GPI) (ft) anhoslcm eccp WU) mV <br /> AL -3in F 1169 1.- zc� U <br /> 8 , Z C3 o -e <br /> 7�19z3 Z Q , r� r��F�is1A cl it <br /> 1 l I r2 ZS <br /> VAMASSOCIATES <br /> INC. <br /> 9hWR0NMENTAL.GEOTECHNICAL AND UA-LS pROPS55I42NAL5 <br />