My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
1444
>
3500 - Local Oversight Program
>
PR0545520
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 5:22:48 PM
Creation date
3/11/2020 3:30:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545520
PE
3528
FACILITY_ID
FA0006186
FACILITY_NAME
U S RENTALS
STREET_NUMBER
1444
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1444 E MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> Page 2 <br /> 3.0 Re-Excavation Work Plan-Continued <br /> �► 1. Excavate contaminated soils starting at the point <br /> of release to a maximum depth of 30' (See plate <br /> 13.1 for overview) . San Joaquin County Flood <br /> Control and Water Conservation District map from <br /> the Spring of 1983 indicates the ground water <br /> level to be approximately -60' at the subject <br /> location. <br /> 2. The excavated spoils will be stockpiled onsite and <br /> covered with 6 mil black plastic sheeting pending <br /> disposal or treatment. <br /> 3. Soil samples shall be taken during the excavation <br /> and screened onsite with a P.I.D. meter to minimize <br /> the extent of "over-excavating" . <br /> 1-1 <br /> 4. Confirmation samples will be taken from the excavation <br /> floor and sidewalls (See plates 3 .2 and 3.3) and <br /> analyzed for TEPH-D, TPH-G and BTX&E. The initial <br /> tank removal samples were also analyzed for Total Pb <br /> and EDB. Upon reviewing the analytical data it was <br /> noted that all samples taken beneath the tanks were <br /> non-detectable for lead. The levels of EDB were <br /> non-dectable at all sampling points except the east <br /> end of tank #1 which was determined to contain 90 P.P.M. <br /> Ur <br />
The URL can be used to link to this page
Your browser does not support the video tag.