Laserfiche WebLink
REQUIREMENTS = GENERAL <br /> 1 . The District requires written , recorded easements for all of its facilities within <br /> the development area with the recorded instrument number noted on Parcel <br /> and Final ( Subdivision ) Maps . <br /> 2 . The District requires that its irrigation and drainage easements be clearly <br /> identified on recorded Parcel and Final ( Subdivision ) Maps . Any proposed <br /> easements due to relocation requests shall also be identified . <br /> 3 . The District requires that existing irrigation pipelines , canals , ditches , <br /> structures , turnouts and drains on the created parcels ( both District and <br /> Private) be shown on the Parcel and Tentative Subdivision Maps for review <br /> purposes . <br /> 4 . The District requires full , unencumbered access , as determined solely by the <br /> District , to both sides of its facilities and will rehabilitate , at its cost , those <br /> facilities within its control that do not meet that standard . This work shall be <br /> performed by the District after receipt of recorded easements . <br /> 5 . Relocation of District facilities to the benefit of the development must be <br /> coordinated and approved by the District . The District will not allow District <br /> facilities to be installed within roadways . The District shall be contacted for <br /> current Policy and preferred alternatives . All costs associated with design , <br /> approval and analysis of relocations , including reasonable attorney and <br /> consultant fees , shall be at the Developer ' s expense . <br /> 6 . All irrigation facilities to the benefit of the development shall be built off <br /> the District' s easements and rights- of-way . <br /> 7 . The District shall not provide water to ponds except as approved by the <br /> Board of Directors . <br /> 8 . Pre - consultation is recommended with District staff before the Tentative Map <br /> stage . <br /> REQUIREMENTS - IRRIGATION <br /> 1 . No additional irrigation delivery connections will be provided as a result of <br /> development unless approved by the Board of Directors . New points of <br /> delivery as approved by the Board shall be measurable , as per District <br /> standards , and constructed at the expense of the Developer . <br /> 2 The historical water delivery point (s ) for the developed property will continue <br /> to be the point ( s ) of diversion for the development . <br /> 3. The historical water delivery volume for the developed property will not <br /> increase as a result of development without prior approval of the District <br /> Engineer . <br /> Revised February 2017 <br />