Laserfiche WebLink
{ <br /> a <br /> SITE SAFETY PLAN ? Project No. 9688 <br /> Husky Crane, Inc. July 10, 1999 <br /> All personnel participating in the field must be trained in the general and specific hazards unique to <br /> the fob and, if applicable, participate in a medical surveillance p'i ogram. <br /> �y <br /> RMLIAMDUBOVSKYENVIRONMENTAL claims no responsibility for use of this plan by others. <br /> The plan is written for the specific site conditions, purposes, dates and personnel specifieded and must <br /> be amended if these conditions change. i} <br /> I. Site History and Project Information <br /> it <br /> A) Facility Site Description: Approximately 7.5 acre site is located at 2373 Mariposa <br /> Road in Stockton California. A commercial craneI`company and parking lot currently f <br /> occupy the entire site. The surface of the site is capped with rock and asphalt. <br /> II <br /> it <br /> B) Site Occupied: The site is presently occupied by Anthony Crane Rental, (Husky <br /> Crane). <br /> I; <br /> C) Site Map Attached with the Following Designated: <br /> 1)Entry and Emergency egress: 1 <br /> 2) Work Location(s) ! <br /> i <br /> D) Scope of Work: To install one soil boring in the location and in the approximate <br /> center of the tank removal excavation. The boring will be sampled at five foot <br /> intervals until groundwater is encountered. iThe boring will be extended to <br /> approximately five feet below groundwater to obtain a grab groundwater sample. The <br /> anticipated depth of the boring is 70 feet. Afters sampling is complete and in order <br /> to seal the boring the drill hole will be backfilled with neat Portland Cement grout <br /> trimied or pumped from the bottom of the boring up until the boring is completely <br /> sealed. it <br /> E) Written Work Plan: Yes X { <br /> Approval from: County of San Joaquin Public Health Services <br /> y <br /> F) Project Crew: WILLIAM DUBOVSKY ENVIRONMENTAL <br /> Project Manager: William Dubovsky <br /> Field Supervisor: John Carver '! <br /> Site Safety Officer: William Dubovsky <br /> Team Members: 4 <br /> j 1 <br /> i <br /> i 1 <br /> I <br /> 3 <br /> } <br />