Laserfiche WebLink
SITE SAFETY PLAN Project No. 9688 <br /> Husky Crane, Inc. July 10, 1999 <br /> Dust <br /> � r <br /> f <br /> i� <br /> €t <br /> i} <br /> Noise <br /> ;; <br /> C <br /> i <br /> i <br /> B) Personal Protective Equipment and Action Levels See table IV (to be filled out by <br /> CHSO/HSO). TWA/TLV, (pb) = .15 mg/m3 { <br /> IV. Decontamination/Hazardous Waste Generation ;i <br /> A) 3 Step Decontamination Procedures 1 <br /> • Soapy Water <br /> • Rinse Water <br /> • Rinse Water <br /> i3 <br /> B) Personal Protective Equipment <br /> • Respirator shall be cleaned and sanitized by each worker <br /> • Disposable protective safety equipment shouldbe properly disposed of <br /> C) Heavy Equipment <br /> • Steam Clean all field equipment and containing'run-off <br /> I i <br /> D) Hazardous Waste Generation <br /> • Liquid generated during decontamination or 1sampling shall be placed in DOT t <br /> approved 55 gallon drums pending laboratory analysis. <br /> • Disposable protective equipment to be placed in drum. <br /> • Vapor and/or dust generated by site activities to be mitigated by water mist <br /> ,; <br /> t <br /> if <br /> 6 t <br />