Laserfiche WebLink
i <br /> i <br /> J SITE SAFETY PLAN s <br /> � Project No. 9688 <br /> Husky Crane, Inc. July 10, 1999 <br /> t <br /> F) Utility Clearance: <br /> 1)Field clearance done by: WILLIAM DUBOVSKY ENVIRONMENTAL <br /> 2)List Instruments used: USA Underground Service Alert. <br /> Review of site as-built drawings <br /> i' <br /> III. Air Monitoring Equipment/Personnel Protective) Equipment and Action Levels <br /> Monitoring is to be conducted by the Site Safety Officer. Monitoring results and <br /> calibration logs are to be completed, sent to the Corporate Health and Safety Officer, <br /> and to be filed with the Site Safety and Health Elan- see Attachments 1 and 2. <br /> All monitoring shall be performed on a periodic bai is. Periodic is defined as adequate <br /> characterization before, during and after eacli[task/activity. Monitoring should <br /> continue on a continuous basis until the operation is stable and the SSO or CHSO feel <br /> that the monitoring is sufficient to adequately asseli <br /> ss and characterize exposure during <br /> that operation. <br /> ii <br /> All exposure assessment to all chemicals identified as necessary below. Additional <br /> characterization monitoring shall begin immediately if the operation destabilizes, the <br /> environment changes, or the potential for exposure is otherwise affected. <br /> 11 . <br /> A) Monitoring Instruments/Direct Reading Instruments (to be filled out by <br /> CHSO/HSO) °� } <br /> CONTAMINANT INSTRUMENT(6 FREQUENCY <br /> j <br /> 11 <br /> Organics <br /> I� } <br /> j( <br /> fi <br /> i <br /> i1 <br /> 5 E <br /> I� <br />