My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005190
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2373
>
3500 - Local Oversight Program
>
PR0545523
>
ARCHIVED REPORTS_XR0005190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 4:18:34 AM
Creation date
3/12/2020 10:42:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005190
RECORD_ID
PR0545523
PE
3528
FACILITY_ID
FA0009394
FACILITY_NAME
MAXIM CRANE WORKS
STREET_NUMBER
2373
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2373 E Mariposa Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 6. All drill cuttings will be stored 2n seared , properly labeled <br /> drums, and stored on 52te pending results of laboratory analyzes. <br /> Any r2nsate used for steam-cleaning of auger flights. etc. , will <br /> also be stored in sealed drums. <br /> 7. Upnn completion of drilling operations, auger holes will be <br /> gr®uted from bottom to the surface according to County require- <br /> ments,- plugging Operations are to be witnessed by County EHQ <br /> personel . <br /> e. Husky Crane, Inc. has a comprehensive safety plan at the <br /> facility; a copy will be made available to County staff 2f <br /> required. The drilling contractor 2s e%pected to have their own <br /> safet/ requirements. <br /> 9. Upon completion of the work , and review of the laboratory <br /> analyzes, a summary of the results and any necessary recommend- <br /> ations will be prepared and submitted to the County EHD #or- <br /> review and comment. <br /> Depending upon the avai l ab2 l 2 ty of the selected drilling con- <br /> tractor 's equipment , we propose to commence operations no later <br /> than the week of October -. Your of+ l ce will be q 2 ven a minimum <br /> of 4B hours notice prior to starting work . <br /> Mm. J. Hunter & Associates <br /> August 25, 1994 <br /> cc : Bill Johns <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.