Laserfiche WebLink
1 <br /> 1 <br /> TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION 1 <br /> 2.0 BACKGROUND 1 <br /> 21 Site Location 1 <br />' <br /> 22 Tank Removal 1 <br /> 23 Drilling 1 <br /> 24 Excavation and Backfilling 4 <br />' <br /> 25 Monitoring Well Installation and Assessment 4 <br /> 26 Groundwater Monitoring 4 <br /> 3.0 PROCEDURES 5 <br /> 31 Monitoring Well Purge Procedure 5 <br /> 32 Groundwater Sample Collection and Analysis 5 <br /> 1 4.0 FINDINGS 6 <br /> 41 Relative Groundwater Elevation and Gradient 6 <br />' <br /> 42 Laboratory Evidence of Groundwater Contamination 6 <br /> 43 Historical Map Search 6 <br /> 5.0 CONCLUSIONS 8 <br /> 51 Hydrocarbon Impacted Groundwater 8 <br /> 52 Hydrocarbon Impacted Soil 8 <br /> 6.0 LIMITATIONS 8 <br /> LIST OF FIGURES <br /> Figure 1 - Location Map 2 <br /> Figure 2 - Site Plan 3 <br /> Figure 3 - Relative Elevation of Piezometnc Surface 7 <br /> 1 LIST OF TABLES <br /> Table 1 - Relative Groundwater Elevations 5 <br />' Table 2 - Analytical Results of Water Samples 6 <br /> LIST OF APPENDICES <br /> F Appendix A - Stabilization Data <br /> Appendix B - Analytical Results of Water Samples <br />