Laserfiche WebLink
vL ecknics Inc., Page 5 <br /> G�eol0 'rc ? <br /> Project No.: 675.2 <br /> Murray <br /> Soil Investigation Report <br /> January 5, 1999 <br /> 4.3 Schedule <br /> For the purpose of keeping this investigation on track and to address the issues at hand so <br /> escrow can close on March 1, 1999, Geological Technics Inc. proposes the following <br /> schedule: <br /> Task Description Schedule <br /> • Floor Drain Closure TBD <br /> • Septic Tank Content Removal Tan 14, 1999 <br /> L • Leach Line Inspection Jan 14, 1999 <br /> • Sample Collection Jan 14, 1999 <br /> • Sample Testing Jan 22, 1999 <br /> L • Report Prep Jan 29, 1999 <br /> L <br /> C . <br /> L <br />