My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2431
>
2900 - Site Mitigation Program
>
PR0538868
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 2:12:39 AM
Creation date
3/12/2020 11:29:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0538868
PE
2950
FACILITY_ID
FA0022329
FACILITY_NAME
BLINCO TRUCKING
STREET_NUMBER
2431
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17130003
CURRENT_STATUS
01
SITE_LOCATION
2431 E MARIPOSA RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br /> Phase II Site Assessment Work Plan <br /> BLINCO TRUCKING <br /> 2431 East Mariposa Road, Stockton, California <br /> SECTION PAGE <br /> 1.0. INTRODUCTION ...................................................................................................1 <br /> 2.0. BACKGROUND.....................................................................................................1 <br /> 3.0. SCOPE OF WORK................................................................................................2 <br /> 3.1. PERMITTING AND PRE-FIELD WORK PREPARATIONS .........................3 <br /> 3.2. SOIL PROBE BORING AND SAMPLING....................................................3 <br /> 3.3. LABORATORY ANALYSIS..........................................................................3 <br /> 4.0. PROCEDURES .....................................................................................................4 <br /> 4.1. SOIL BORING ADVANCEMENT.................................................................4 <br /> 4.2. SOIL SAMPLING .........................................................................................4 <br /> 4.3. BORING ABANDONMENT..........................................................................5 <br /> 4.4. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT...................5 <br /> FIGURES <br /> Figure 1 — Location Map <br /> Figure 2 — Site Plan <br /> Advanced GeoEnvironmental Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.