Laserfiche WebLink
r�. <br /> 2.2.5 Chemical Analyses <br /> Soil samples collect from the soil Boring for chemical analysis are proposed to be <br /> al zed for 'fl'kIG and 13Tk:X by the; Dk1S Method and 1:1'A <br /> hlet}iud $�' , <br /> an Y <br /> respectively. <br /> 2.2.6 Preliminary Site Assessment Report <br /> The information collected, <br /> analytical results, and TPE's conclusions and <br /> ort will <br /> e work <br /> commendations will be summarized <br /> in a report. �hefor;overexca ation`bandhdrilling <br /> reco require <br /> performed and include: copies of all p plan showing limits of overexcavation and <br /> 1 soil boring, an area map, a detailed site p graphic boring log, <br /> p <br /> location of verification soil s, ands,othertt documentation) boring,o s�pport the conclusions. <br /> results of chemical analyses, a resented within <br /> Conclusions regarding the extent and type(s) of contamination will be p <br /> the context of this workplan. itecommendations or f eas ble remedial alternatives <br /> supplemental sampling and analyses will be <br /> 3.0 SITE SAFETY PLAN <br /> A <br /> Site Safety Plan for conducting work under this workplan is included in Appendix <br /> 4.0 STATEMENT OF QDAI,I>:ICAT10N5 <br /> A statement of qualifications for the lead p <br /> rofessional supervising work conducted <br /> under this workplan is documented in Appendix F. <br /> 6 <br />