Laserfiche WebLink
5.0 TIME SCHEU[31-E <br /> -. � time sch��dt.le far implerncnt.rtion of the •Veltv1t,es rablem-freedin programis <br /> The project <br /> workplan. is presented below. The schedule nee eR;�+ng'relatively <br /> laboratory analyses could <br /> - However, delays it the workplan review, P adverse weather, and regulator review <br /> lengthen► the project schedule. Access difficulties, <br /> could also delay the proposed time schedule. TPE will make every effort to adhere <br /> to +�,e project schedule. <br /> r Regulator Approval; Obtain <br /> Week is <br /> Client Submits Workplan fo <br /> Soil Borin; Permit. <br /> Week Z: Regulator Approval Receitled. <br /> Conduct Overexcavation and Chemical Analyses of <br /> Week 2: <br /> Verification Soil Satraplin€. <br /> Week 3: <br /> Chemical Analyses; Conduct Soil Boring and Collect Sail <br /> Samples for Chemical Analyses. <br /> Week 4: Receive Chemical Analyses, Interpret Data aad PSAR. <br /> r Week 5: Submit PSAR to Client. <br /> 7 <br />