Laserfiche WebLink
J & H Williams, LLC 48-96) <br /> (Administratively Amended by P10-097) <br /> August 10, 2010 <br /> g Within 24 menths, the operater shall apply fer a building permit to Gover 601,; <br /> The <br /> rem T entire perimeter of the property shall be screened within 30 days of the <br /> effective date of this permit to a height of at least 20 feet and GgVeFed wrapped with mesh <br /> for litter/dust control on the sides and the tap <br /> 9. The inbound single-stream receiving and processed paper storage areas shall be <br /> obscured GeveFed with mesh screens within 30 days of the effective date of this permit. <br /> 10. The operator shall contract with a pest control company for ongoing pest control services <br /> and provide evidence of this to the Community Development Department on a quarterly <br /> basis. <br /> 11 . The epeFater shall install a litter/dust baFFieF at least 20 feet tall aFeuRd the entire <br /> Perimeter of the pPE)jGGt Site, with the eXGeptiOR of the gates. <br /> Ge n��e. <br /> 13. The operator shall immediately initiate a daily street sweeping program to remove debris <br /> from the site and the area surrounding the site as follows: 1) Church Street, adjacent to <br /> the property; 2) Lincoln Street, adjacent to the property; 3)West Sonora Street, adjacent <br /> to the property; 4) South Harrison Street, adjacent to the property; and 5) at other times, <br /> as warranted, in response to complaints received by affected neighborhoods. <br /> 14. During regular business hours and upon complaints being received from neighbors, the <br /> operator or appointee(s) shall conduct periodic inspections in order to manually clean up <br /> any debris surrounding the facility. <br /> 15. A written, 90-day progress report TheFe shall be submitted to the Community <br /> Development Director for review,a six enth, and ,GRe year and GGRtir, al aRR al review-.. <br /> not this Use Perm"f every ninety (90) days, starting from the effective date of this <br /> amends en ed of the Use Permit mien until its expiration. Progress reports shall <br /> include demonstration of Use Permit compliance, a discussion of complaints received and <br /> subsequent corrective measures taken, and a status update of the transition to the Weber <br /> Avenue location. <br /> 16. As part of the annual review, Beginning on November 1 , 2010, and annually thereafter, <br /> the operator shall submit at-4e a yearly progress-report thirty(30) days "r, adv@ Ge „f the <br /> that includes the previous twelve (12) month's reports from routine inspections conducted <br /> by the State Integrated Waste Management Board on the facility and an outline of any <br /> reported violations and corrective measures taken to remedy those violations. The report <br /> shall also include any complaints received by the facility and corrective measures taken <br /> on those complaints. <br /> PAGE 2OF4 <br />