Laserfiche WebLink
lFerx"fulINC. <br /> This Phase II Subsurface Investigation report was prepared by Versar for Bank of <br /> America. Mr. Vernon P. Elarth supervised the drilling operations and prepared this report. Mr. <br /> Tim Berger, California Registered Geologist No. 5225, supervised the field operations and the <br /> preparation of this report. <br /> Prepared By: Approved for Release By: <br /> Vernon P. Elarth �P(Tim Berger, R.G. 5225 <br /> Associate Geologist Senior Geologist <br /> Environmental Management Division Environmental Manag },\ <br /> 77:- <br /> c� <br /> I� Rg No. 5225 <br /> Exp. 6130P98 <br /> 9TF OF CA,1 <br /> 4583-97/3622-500/]un30'97 ES-2 <br />