Laserfiche WebLink
APPENDIX A <br /> DRILLING AND SAMPLING PROTOCOL <br /> Permits will be obtained as necessary for all borings before <br /> drilling begins. Borings will be drilled using hollow-stem <br /> augers. All drilling equipment will be thoroughly steam- <br /> cleaned before drilling begins to prevent the introduction of <br /> contamination from off-site, and between borings to prevent <br /> cross contamination. 'The water from the steam cleaner will <br /> be contained so that it will not enter storm drains or become <br /> subsurface water. The borings will be logged under, the <br /> supervision of the project geologist. All borings will be <br /> drilled in such a manner as to prevent cross-contamination <br /> between strata. All soil borings will be backfilled with a <br /> mixture of cement and bentonite grout. <br /> The cuttings and extruded samples from the drilling operation <br /> will be contained on-site for- proper disposal as deemed <br /> necessary .and appropriate upon receipt of lab results. This <br /> disposal will be the responsibility of •the client unless <br /> other arrangements have been made in writing. <br /> All soil sampies will be properly labeled, including the <br /> date, sample location, and project number. Field records <br /> will be documented and will consist of the above information <br /> and other significant data. The samples will be placed on <br /> ice immediately for transport to the laboratory. • Under no <br /> circumstances will the samples be opened by anyone other than <br /> the lab personnel. Chain of Custody records will be <br /> maintained at all times. Samples will not be tested after <br /> their sample life has been exceeded according to EPA guide- <br /> lines, and will be properly disposed of when their useful <br /> life has expired. . <br /> All soil sampling equipment will be thoroughly cleaned prior <br /> to the beginning of sampling and between samples. Relatively <br /> undisturbed soil samples will be taken at intervals of S <br /> feet. The soil samples will be taken using brass liners in a <br /> split. spoon sampler. The samples will not have headspace in : <br /> the liners, and will be immediately sealed in their liners <br /> using plastic caps held in place with duct tape. <br /> It is understood that the client will retain ownership and <br /> responsibility for all samples unless other arrangements have <br /> been made in writing. <br />