My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1405
>
3500 - Local Oversight Program
>
PR0545492
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 11:52:16 AM
Creation date
3/13/2020 11:14:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0545492
PE
3528
FACILITY_ID
FA0000309
FACILITY_NAME
MCHENRY STATION & MINI MART
STREET_NUMBER
1405
STREET_NAME
MAIN
STREET_TYPE
ST
City
ESCALON
Zip
95320
CURRENT_STATUS
02
SITE_LOCATION
1405 MAIN ST
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� } <br /> ETS ENVIRONMENTAL PROJECT 301 <br /> PAGE 4 <br /> hydrocarbon constituents - benzene, toluene, xylene, EDB, EDC <br /> � and total purgeable hydrocarbons using EPA method 8240 "Fuel <br /> Fingerprint". Methodology of the analytical lab is included <br /> in Appendix B. Should any analytical results return positive <br /> from the waste oil tank sample, additional analysis will be <br /> run for metals as required. This will be done to avoid <br /> unecessary analysis should the soil be clean. If apparent <br /> contamination is noted in the field, the sample will be <br /> � <br /> analyzed for all' of the above. <br /> A report will be prepared stating the findings of the <br /> A investigation, drawing conclusions from the findings and <br /> making recommendations based upon those conclusions. <br /> | ' <br /> 5. 0 REMARKS ANB` SIGNATURES <br /> This workpla' n has been prepared by ETS Environmental <br /> J based upon current site information and the latest available <br /> data. ETS is not responsible for undisclosed conditions. <br /> All work conducted by ETS will be done so with the highest <br /> � regard for the accuracy and integrity of the data collected. <br /> � . <br /> The scope of <br /> work presented in this workplan will be � <br /> completed using industry-standard procedures outlined in the <br /> h sampling protocol in Appendix A. <br />� Prepared by: <br /> � <br /> 'AL- ~ 61 <br /> � | <br /> Glen White, <br /> Project Geologist <br /> (v(o8-402-4 <br /> — Reviewed and approved by: <br /> J ' <br /> Dick Stratton <br />�= <br /> General Manager <br /> w� <br /> ) <br /> | <br /> U � <br /> / <br /> � <br /> i <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.