My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
19589
>
2900 - Site Mitigation Program
>
PR0525999
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 2:45:29 PM
Creation date
3/16/2020 1:49:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0525999
PE
2951
FACILITY_ID
FA0017597
FACILITY_NAME
DANNA FARMS INC
STREET_NUMBER
19589
STREET_NAME
MCKINLEY
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
24126002
CURRENT_STATUS
01
SITE_LOCATION
19589 MCKINLEY AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j <br /> LIGHT, AIR & SPACE CONSTRUCTION <br /> ENVIRONMENTAL SERVICES COMPANY <br /> State Contractor's License Number 445403 <br /> State EPA R,E.A.Number 04072 <br /> Well purge water will be placed on the bio-remediation treatment pad for treatment. <br /> Item 5: <br /> Laboratory analysis of the soil and groundwater samples will include the following, <br /> TPH Gasoline,TPH Diesel, Tert-Butyl alcohol (TBA) ,Methyl tert-butyl ether(MTBE), <br /> Di-isopropyl Ether(DIPE),Ethyl tert-butyl ether(ETBE), Tert-Amyl methyl ether(TAME), <br /> Benzene, Toluene, Ethyl benzene,Total xylenes and lead. <br /> Item b: <br /> LA&S will prepare a report documenting the over-excavation of the contaminated soils <br /> from the former locations of UST# 1 and UST#2. <br /> LA&S will prepare a separate report documenting the bio-remediation of the affected <br /> soils. <br /> LA&S will prepare a well-installation and first quarter groundwater monitoring well <br /> report for the installation and first sampling of the proposed groundwater monitoring <br /> wells. <br /> The reports will <br /> be prepared and stamped by a C.E. G. <br /> Item 7: <br /> LA&S will properly abandon the six (6) groundwater monitoring wells once the closure <br /> has been approved by the local.regulatory agency. <br /> A proposed Excavation and treatment pad site plan will be submitted as a separate document. <br /> A proposed Groundwater Monitoring Well location site plan will be submitted as a separate <br /> It <br /> document. <br /> �I <br /> A separate Site Specific Heath and Safety Plan will be submitted with this propos Al <br /> 55 �01AER yj,0 �� <br /> 9 <br /> pect 11 O�?Q No.1262 � ? <br /> CERTIFIED cn <br /> ENGINEERING <br /> °U 11 GEOLOGIST <br /> vid B. Guthridge, P ncipal Christopher M. Palmer, C.E.G. 1 <br /> fi CA <br /> June 15 2005 O <br /> Page <br /> MAIN OFFICE • 1707 LITTLE ORCHARD STREET,SurrE A•SAN JOSE•CA•95125 <br /> MAILING ADDRESS•P.O.Box 36303+SAN JOSE•CA•95158-6303• <br /> 408/979-0661 OFFICE*408/979-0621 FAX-408/640-2899 CELL PHONE•DGUTI IRIDGE(aDLIGHTAIRANASPACE.COM E-MAIL <br /> GENERAL AND ENGINEERING CONTRACTOR•HAZARDOUS SUBSTANCE REMOVAL CONTRACTOR-SITE ENVIRONMENTAL ASSESSMENTS <br /> WETLAND AND RIPARIAN HABITAT—ASSESSMENT—DESIGN—RESTORATION—CONSTRUCTION—MITIGATION MONITORING <br />
The URL can be used to link to this page
Your browser does not support the video tag.