Laserfiche WebLink
• i <br /> We will have staff onsite on Thursday(10/23) and Friday(10/24) if you are prepared to over drill these wells. <br /> Respectfully, <br /> Adrienne <br /> Adrienne Ellsaesser, REHS <br /> Unit IV Program Coordinator <br /> Groundwater Protection Programs: <br /> Site Mitigation/LOP/5mall Public Water Systems <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton ,CA 95205 <br /> 2 (209)468-0343/ 8 (209)468-0341 <br /> ®aellsaesser@sjcehd.com <br /> From: McGovern, Cameron [mailto:Cameron.McGovern(alarcadis-us.com] <br /> Sent: Tuesday, October 14, 2014 11:39 AM <br /> To: Adrienne Ellsaesser [EH] <br /> Cc: BWaite(a)chevron.com; mcmillans521@ ahoo.com; Munn,Julie; Sobieraj, Justin; Gabriel Gonzalez [EH]; John Yoakum <br /> [EH]; Rogers, Tamera <br /> Subject: RE: 437 E Miner Ave., Stockton <br /> Good morning Adrienne, <br /> Welenco, Cascade,and ARCADIS will be onsite Thursday(10/23) and Friday(10/24) to destroy the remaining%" sparge <br /> points via blast perforation (eight%" sparge point locations remaining)at Chevron Site 306415.The remaining sparge <br /> wells will be destroyed using the methodology outlined in the correspondence below. <br /> I have attached Table 1,which outlines the proposed well destruction methods for the wells remaining onsite.All over- <br /> drills and mushroom caps will be completed in early 2015. <br /> Can a representative of the SICEHD please meet the field team onsite Thursday(10/23) morning around Sam. <br /> If you have any questions or concerns, please do not hesitate to contact me. <br /> Thank you, <br /> Cameron McGovern I Environmental Scientist I I Cameron.McGovern(Darcadis-us.com <br /> ARCADIS U.S., Inc. 1 101 Creekside Ridge Court, Suite 2001 Roseville,CA 95678 <br /> T: 916 865 3175 1 C: 818 359 1159 <br /> www.arcadis-us.com <br /> ARCADIS, Imagine the result <br /> 2 <br />