My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
437
>
3500 - Local Oversight Program
>
PR0541875
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 4:42:27 PM
Creation date
3/16/2020 2:11:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0541875
PE
2960
FACILITY_ID
FA0024017
FACILITY_NAME
CHEVRON SITE 306415
STREET_NUMBER
437
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
1392417
CURRENT_STATUS
01
SITE_LOCATION
437 E MINER AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Page 2 of 4 <br /> Hi Julie, <br /> We checked our file and we will need a current MFR. <br /> Thanks <br /> Adrienne <br /> From: Munn, Julie [mailto:Julie.D.Munn(ai)arcadis-us.com] <br /> Sent: Monday, September 08, 2014 1:41 PM <br /> To: Adrienne Ellsaesser [EH]; John Yoakum [EH] <br /> Subject: FW: 437 East Miner Ave. (306415) - Permit Applications <br /> Johnny/Adrienne- <br /> Attached are the 3 permit applications for the upcoming well destructions associated with the <br /> former Chevron site no. 306415 located at 437 E. Miner Ave, in Stockton. All monitoring or <br /> remedial wells will be destroyed by detonation methods and the soil vapor probes will be hand <br /> augered or over-drilled depending on the depth (per the email correspondence below). Permit <br /> applications, blast plans for individual wells and a table showing the well construction and <br /> destruction methods are attached. <br /> I am sending this via email with the hope that the permit review process can begin right away. I <br /> have requested a check from my corporate office in the amount of$11,830($390 for each permit, <br /> plus$130 per well/82 wells). I should have the check by Wednesday and will fedex the entire <br /> package including wet signatures from the driller/LCD and me for arrival on Thursday. It is our <br /> hope to get this work going beginning September 22, 2014. Is this enough time for approving the <br /> permits? <br /> Also, can you tell me if you have a Master File Record Information Form for this site already? I <br /> believe you should but wanted to double check. <br /> Thank you, <br /> Julie D. Munn I Project Scientist I Julie.D.Munn(a)arcadis-us.com <br /> ARCADIS U.S., Inc. 1 101 Creekside Ridge Court, Suite 200 1 Roseville, CA 95678 <br /> T: 916.865.3153 <br /> www.arcadis-us.com <br /> ARCADIS, Imagine the result <br /> Please consider the environment before printing this email. <br /> From: "Adrienne Ellsaesser [EH]" <AEllsaesser@sicehd.com> <br /> Date:August 21, 2014 at 9:03:38 AM PDT <br /> To:<bwaite@chevron.com> <br /> 9/9/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.