<br />   		SUMMARY OF PROPOSED WORK:     CONSTRUCTION NOTES:  											CONTACT INFORMATION:
<br />   		1.  INSTALL(2X)NEW 49'SEMI DEEP-DEEP WELL ANODES   															PROTECT MANAGER     -  LARRY CARLOS       (925)78]-8390
<br />      		(SD-0WA)SPACED 30-ADJACENT TO 12988 NEUGEBAUER RD,    GENERAL REQUIREMENTS:     												PROJECT ENGINEER(PED)   -  RYAN WOOD	(925)285-7838
<br />      		STOCKTON  																		ESTIMATOR/DESIGNER   ---  FRANKTOWNSEND     (925)24x3234
<br />				A POLE      		1. UNDERGROUND SERVICEALERT:       				11.TIE-IN AND CLEARANCE PROCEDURE TO BE PREPARED AND PERFORMED IN ACCORDANCE WITH					(510)621.9204
<br />   		2.  INODEJUN0 V-2 BOX(M301528),
<br />					RMU,AND RECTIFIER     E       ULL811(1-WO-227-2600)A MINIMUM OF 2 BUSINESS DAYS(NOT INCLUDING INITIAL DAV OF 	THE FOLLOWING WORK PROCEDURES:  				LOULCORROSION      -  MARCOSOCEGUEM
<br />      		ANODEJUNCTIONBO%OUND ODRMI,ANDAC O-DISCONNECT.      														SUPERVISOP
<br />   		3.  IN STALL(2j NEWCU GROUNDR LEADS T G5&50.11.1   	CONTAR)INS BEFORE FOR THE MARKING EXCAVATE.
<br />      											UTIIfOES,INCLUDING ALL  								LOULCORROSION      -  BIU BELASKI	(209)406-7844
<br />      		CATH 4.  INSTALLE ADS WILL
<br />      				LEADSDFROM-MCESS ROAD TO
<br />     							NON-UTILFTIES BEFORE VOLA DIG,GRADE,ORIXUVATE.     			A.SHUTDOWN NDTAND IE-IN. DWORKMETHODS FOR NATURAL GAS TRANSMISSION PIPELINE     MECHANIC
<br />     	E	POLEMOLEADSWILLNEEDTO CTIONBND FROM ACCESS ROADTO 								TDU IWNACLEAR N.      										E
<br />      		PNODE WIR SAND NEW
<br />   				(UNCTION BOX.       	2. A.DIMENSIONS
<br />       														B.TD-44415,GASCIEARl1NCE PROCEDURES FOR FACILITIES OPERATING OVER 60 PSIG.
<br />   		S.
<br />      		ANODEWIRESAND NEW CATHODE LEADS TO BE LANDED IN       A FROM SEVERAL OWNON ES,AND DRAWINGS VE ARE IN ASED
<br />    											ON THE BESTAVAILABLEINFORMATION
<br />      		NEW AIB PER G58S 0-13.2.  			FROM SEVERAL SOURCES,ANDSNALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL    12 COATING REMOVAL:
<br />   		6.  WIRE WATCHDOG SCOUT RMU IM042141)TO NEW RECTIFIER	PRIOR TO FABRICATION.
<br />   		7.  INSTALL NEW ELECTRIC SERVICE ON PG&E POLE 120344302.	B.THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF  	A.PERFORM THE FOLLOWING STEPS,IN ACCORDANCE WITH TD-4711P-01,BEFORE REMOVING
<br />       							UNDERGROUND UTILITIES,PROPERTY LINES,AND OTHER SUBSTRUCTURES IS NOT GUARANTEED	ASPHALTIC PIPE WRAP ON PIPELINES INSTALLED PRIOR TO 1972(BASED ON PG&E ANALYSIS,
<br />       							TO BE ACCURATE OR ALL-INCLUSIVE,UNLESS OTHERWISE NOTED.CONSTRUCTION PERSONNEL	PIPE INSTALLED IN 197208 LATER DOES NOT HAVE PIPE WRAP THAT CONTAINS ASBESTOS):
<br />       							ARE RESPONSIBLE FOR MAKING ALLDETERMINATIONS ASTO THE TYPE AND LOCATION OF
<br />       							UNDERGROUND UTILITIES AND OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR 	1.WHEN A PIPE WRAP SAMPLE IS REQUIRED TO BE ANALYZED FOR ASBESTOS:
<br />       							ENCROACHMENTS.   						a.[TILLER SAMPLE PER TD-4711P-01 AND COMPLETE CHAIN OF CUSTODY FORM
<br />     							C.PROSPERING IS REQUIRED AHEAD OF WORK.ALL OFFSETS OR ROPING WILL NEED TO BE		T"11P-01-F01.
<br />       							APPROVED BY THE PG&E PROJECT ENGINEER(PED),AND REDUNED DETAILS SHOWN ON PROFILE  	b.FILE PINK COPY OF THE CHAIN OF CUSTODY FORM AND FINAL LABORATORY RESULTS
<br />       							AND CONSTRUCTION DETAIL SHEETS OF EACH ADDITIONAL SUBSTRUCTURE.       		WITH THE AS-BUILTS.
<br />     							D.ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT     							REFERENCE DRAWINGS:
<br />       							DIG METHODS(e.g.VACUUM EXCAVATIONS OR SIMILAR).    			2.WHEN REMOVING PIPE WRAP THAT CONTAINS ASBESTOS,OR FOR EMERGENCY WORK,
<br />   															FOLLOW TD-4711P.01'PIPE WRAP REMOVAL,HANDLING AND DISPOSAL".
<br />  							3. ELBOWS AND FIELD BENDS:
<br />      																					OPERATING MAPS
<br />     							A.ALLBENDSARE IN LBOWS,
<br /> 									ACCORXCEPT DAERE NCE WITH
<br />       										OTHECT FIELD.NDS FIELD ARE SHOWN,FIELDS NDSILLI      CATHODIC PROTECTION NOTES:   								- 384512,REV 63
<br />       							SHALL BE MADE IN ACCORDANCE WITH A-36,SECTION 4D.FIELD BENDS MAY BE USED IN LIEU      							OPERATING DIAGRAMS
<br />       							OF ELBOWS WHEN PRLAPPROVED BY THE FG&E PROJECT ENGINEER PED).       	1. FOLLOW TO-SIODP-01 TO DOCUMENT INTERNAL CORROSION AND EXTERNAL CORROSION   				-- R06216,REV3
<br />     							B.IN ORDER TOAVOID EXCESSWESTRAIN ON THE PIPELINE,THERE SHALL BE A MINIMUM   	INSPECTION OF THE PIPELINE.       				AS-BUILTS
<br />       							SEPARATION OF 5 FEET BETWEEN A ROPED SECTION OF PIPELINE ANDANY ELBOWS OR FIELD  											-- 30972M7ASBUILTDWG   p
<br />       							BENDS.  						2. INSTALL ELECTROLYSIS TEST STATIONS IN ACCORDANCE WITH GAS DESIGN STANDARDS
<br />       							FIELDCONDITIONS.
<br />  								CONDITIONS.
<br />     							C.ALLOWNIN THE PUN AND PROFILE ARE APPROXIMATE AND SHALL BE CUT TO SUR       0-10.0-10.1 AND 0-10.2.
<br />  							4. SEPARATION FROM OTHER STRUCTURE S:  				A. UPON COMPLETION OF BORINGS,CONTACT THE CORROSION SUPERVISOR FOR THE LOCAL
<br />     							A.CROSSING UNDERGROUND FACILITIES:PG&E PIPELINE MUST BE INSTALLED WITH AT LEAST 	AREA/DIVISION TO PERFORM CURRENT DRAIN TESTS ON THE PIPEUNE SEGMENT THAT
<br />       							24 INCHES OF CLEARANCE FROM ANY OTHER SUBSTRUCTURE/UTILITY NOT ASSOCIATED WITH	WAS INSTALLED IN THE BORE.THE CURRENT DRAIN TEST MUST BE PERFORMED PRIOR TO
<br />       							THE PIPELINE UNLESS NOTED ON THE DRAWINGS.      			WELDING PIPE ON EITHER SIDE OF THE BORE.
<br />   		SEQUENCE OF OPERATIONS:    	S.
<br />       							PARALLEUNG UNDERGROUND FACILITIES:THIS PIPELINE MUST BE INSTALLED WITH AT LEASE     4. FOR THE INSTALLATION OF THE WATCHDOG RECTIFIER REMOTE MONITOR.CONTACT THE
<br />       							SFEETOFCLEARANCE FROM ANY OTHER UNDERGROUND STRUCTURE/UTILITY NOT ASSOCIATED      CORROSIONTHEINSSUPERVISOR FOR THE HE LOCAL WATCHDOG
<br />       																	REDIVISION.
<br />   		SEE ABOVE      				WITH THE PIPELINE UNLESS NOTED ON THE DRAWINGS.
<br />   							S. RESTORATION AND CLEAN UP:					5, BONDING CABLES TO BE INSTALLED ACROSS PIPELINE CUT-OUTS GAT ALL LOCATIONS THE
<br />     							A.RESTORATION WOF ITH THE STESTCITY,SIDEWALKS,COUNTY,OR
<br />    											ETC.ABOVE PIPE BEDDING SHALL BE IN       PIPELICONSTE ISRUCTION
<br />     															SEVEREDPRIOR TO AGEMENT APPROAL.VED
<br />      																	CLIN AMPS AND
<br />       																		(MINETIRANDED,OROTHER
<br />     																				AL
<br />       							ACCORDANCE WITH THE LATEST OPS COUNTY,OR AGENCY STANDARDS.  		CONSTRUCTION MANAGEMENT APPROVED DAMPS AND E IS
<br />  																			STRANDED CABLE SHALL
<br />     							B.WHERE EVER THERE ARE ROW CROPS,THE TOPSOIL SHALL BE REMOVED TOADEPTH OF 12-AND      BE UTILIZED.CLAMPS TO REMAIN IN PLAIT UNTIL PIPELINE IS TIED IN,
<br />       							STORED ON SITE.UPON COMPLETION OF CONSTRUCTION,THE TOPSOIL SHALL BE RESTORED.     RETIREMENT PROCEDURE FOR EXISTING PIPE:
<br />       							TAKE CARE TO PREVENT MIXING OF TOPSOIL AND SUBSOIL
<br />   							6. DESIGN NOTES:       					1, GT&D UTIUTY WORK PROCEDURE TD950OP-16,"DEACTIVATION AND/OR RETIREMENT OF
<br />     							A.THIS DRAWING HAS BEEN CREATED BY REVIEW OF THE AS-BUILT DRAWINGS&RECORDS.  	UNDERGROUND GAS FACILITIES;SHALL BE FOLLOWED.
<br />    	_ 						ACCURACY IS DEPENDENT UPON THE SOURCE DOCUMENT LISTED ON THE REFERENCE 	2. THE EXISTING PIPE SECTIONS SHALL HAVE FREE LIQUIDS REMOVED AND BE 200%PURGED
<br />       							DRAWINGS.  						PER GAS DESIGN STANDARD A-38,"PROCEDURES FOR PURGING GAS FACILITIES."
<br />    	C       					B.PIPE&FIRING SEPCIFICATIONS WITH ASTERISK(')ARE CONSERVATIVE ASSUMED VALUES
<br />       							PER TD4125P-D9 PROCEDURE FOR THE RESOLUTION OF UNKNOWN PIPELINE FEATURES(PRUPF).   3. THE PIPE SHALL BESECTIONALIZED AT INTERVALS AS SPECIFIED IN THE RETIREMENT PLAN.
<br />     							C.ALL WORK DEPICTED IN THIS DRAWING IS TO BE A BUILT UNDER THE PRIMARY ORDER NUMBER.      THE LOCATIONS CALLED OUT ARE APPROXIMATE AND ARE SUBJECT TO FIELD VERIFICATION TO
<br />   							7. WELDING REQUIREMENTS:    					IDENTIFY THE MOST OPTIMUM LOCATION IN THAT VICINITY.ACCURATE SURVEY DATA MAY
<br />     							A.ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL	NOT BE AVAILABLE FOR THESE LOCATIONS SOUSE CAUTION DURING EXCAVATION AND WHEN
<br />       							MANUALTDAI60M.REFER TOTO-416OP-20 ORTD-0160P-26 FOR GENERAL WELDING REQUIREMENTS.  IDENTIFYING THE PIPELINE TO BE RETIRED.OTHER ACTIVE PIPELINES MAY BE IN THE AREA.
<br />     							8.PERFORM ALL IN-SERVICE WELDING PER UTILITY PROCEDURE RD-416OP-40.       	4. AT EACH SUCH LOCATION NOTED ABOVE,A PIECE OF PIPE AT LEAST 24"LONG SMALL BE
<br />     							C.ALL CANS OR SPOOLS SHALL BEA MINIMUM LENGTH OF ONE PIPE DIAMETER,WHENEVER POSSIBLE.
<br />     							D.WHEN INTERNAL MISALIGNMENT AT GIRTHWELDS EXCEEDS 0.094",BACKWELD WHERE THERE 15      REMOVED.INSTALL A I'HIGH PRESSURE SAVE-A4ALVE(H-17491,M022287)TO CHECK FOR
<br />       							ACCESS TO THE INSIDE OF THE WELD.WHERE THERE IS NO ACCESS TO THE INSIDE OF THE WELD,      PRODUCT AND PRESSURE PRIOR TO CUTTING INTO THE PIPELINE.THEOPENENDSOFTHE
<br />  								I
<br />       							MACHNEBORINGOR GRINDING IS REQUIRED.RACKWFLDING,GRINDING,OR BORING MUST BE      RETIRED PI PE SHALL BE SEALED BY THE MOSTAPPROPRIATE METHOD OUTUNED IN GT&D
<br />       							DONE N ACCORDANCE WITH TD436OP-20 OR T04160.26,AS APPROPRIATE.		UTILITY WORK PROCEDURE I13-9500P-16.BACKFILL MUSTBE THOROUGHLY COMPARED IN
<br />       														PLACE OF THE REMOVED SECTION OF PIPE.
<br />   							8. STRENGTH TEST REQUIREMENTS      				DESIGN CHANGE PROCEDURE
<br />     							A STRENGTH TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD
<br />       							A-34ANDSHALL  SHALL
<br />										IN ACCORDANCE WITH UTILITY PROCEDURE TD11375.	MAINTENANCE AND CONSTRUCTION PERSONNEL MUST OBTAIN APPROVAL FROM THE PROJECT
<br />     							B.ALL WELDS THAT HAVE NOT BEEN STRENGTH TESTED AND ALL FITTINGS SHALL BE SOAP TESTED AT   ENGINEER JPED)BEFORE MAKING ANY DESIGN CHANGE TO GAS FACILITIES PER TD4014P-01.
<br />       							100 PSI AND AT OPERATING PRESSURE BEFORE COATING CAN OCCUR.
<br />   							9. COATING REQUIREMENTS:
<br />    	B       					A.ALL EXPOSED PIPE AND FITTINGS ARE TO BE COATED IN ACCORDANCE WITH GAS STANDARD      													B
<br />       							E-30.ALL COATING ON BURIED PIPE AND FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH
<br />       							GAS STANDARD E-35.
<br />     							B.FOR COATING SELECTIONS ON BURIED PIPE,SEE DIRER BURIAL COATING SELECTIONS TABLE.
<br />     							C.CONTACTTHE PROJECT ENGINEER[PED)TO REQUEST VARIANCE FROM THE
<br />       							APPROVED COATING PRODUCTS.
<br />   							10.A.WHEION R EXISTING PIPELINE:
<br />     							ACO STR CTION,FOLOWTDGASfA0UODTIES AREEXCAVATE I DURING ENGINEERINGOR ESTO EXISTING CONSTRUCTION,FOLLOW TD-5100P-01 TO DOCUMENT PIPE INSPECTION.THIS APPLIES TO EXISTING      												✓i
<br />       							AND TO BE RETIRED FACILITIES.																		�
<br />     							B.EXISTING GIRTH WELDS,AT TIE-IN LOCATIONS,SHALL BE IDENTIFIED AND REMOVED IF PRACTICAL     											GAS TRANSMISSION
<br />       																									ESTIMATING DESIGN
<br />     							C.PRIOR TO TIE-IN,IN PER COATING AND PIPE FOR DEFECTS.IF DEFECTS ARE FOUND,
<br />       							CONTACT PROJECT ENGINEER(PED)FOR GUIDANCE.
<br />    	A       																									A
<br />     									WARNING:      		O								PIPELINE-CONSTRUCTION NOTES  	wR sLl>
<br />       											1
<br />     									I N)vl.-Al PiRROP I TAR      1   										L-057A-MDl MP 0.93   	"0267�
<br />       									LFrvov vpuvK Grs       										INSTALL(2)49'DWA's&RECTIFIER
<br />     									rUCTNc mMVANV ANo Is      										STOCKTON,SAN JOAQUIN COUNTY       		'
<br />     									�uiiaAlzro onar¢Gnsa+o I.P.rears Dgbr.      			i0R1P1t11pX
<br />     									FIECTRK COMPANYEMPIDY.       		.  		wvlw       					DOLL OIS FUC CL
<br />     									ANOIR AGENCY.	CBIIBeIDre VDD OIp.       								PACIFIC GAS AND ELECTRIC COMPANY
<br />      										o vGgr m.					R E V I S IONS       				SAN FRANCISCO,CALIFORNIA
<br />			1   		2   	}I      3   		4   		5     al     	6   		7  		;(8  		9    I       	10 a  '•a
<br />
								 |