Laserfiche WebLink
1 2 71 3 4 6 7 118 9 10 <br /> DIRECT BURIAL COATING SELECTIONS LEGEND: DETAIL LEGEND: <br /> MAIN LINE COATING FBE(E-35.4) —GT— GAS TRANSMISSION LINE(PROPOSED) -- FENCE GAS UNE MARKER(OTHER) WATER VALVE ----- PROPOSED GAS TRANSMISSION UNE <br /> MINOR REPAIRS LIQUID EPDXY E-35.31 —GT(r)— GAS TRANSMISSION LINE(TO BE TES rEDI LW,A�TYPE �•I INSULATION JOINT CABLE TV BOX <br /> TIE-IN WELDS UQUID EPDXY(E-35.1 —GT— GAS TRANSMISSION LINE EXISTING) WALL EXISTING GAS TRANSMISSION UNE <br /> GIRTH WELDS UQUID EPOJ(V(E-35.1) --- --- BARRIER ® PRESSURE CONTROL FITTING ii TELECOMM BOX <br /> BUTT WELDED FITTINGS UQUID EPDXY(E-35.1 —GD— GAS DISTRIBUTION LINE(EXISTING) TEMPORARY GAS TRANSMISSION UNE <br /> E —GS— GAS SERVICE LINE(EXISTING) TEMPORARY BARRIER(TYPE K) Q GASBOX IY`., TELECOMM VAULT (OWNED BY PG&E) E <br /> VALVE ASSEMBLIES UQUID EPDXY IE-35.7),WAX TAPE(E-35.7) <br /> SHORT SEGMENTS OF PIPE LIQUID EPDXY(E-35.1). ---GT--- GAS TRANSMISSION LINE(RETIRED) -- GUARDRAIL ® GAS HIGH PRESSURE REGULATOR ❑D STREET UGH--BOX TE MPCRARY GAS TRANSMISSION UNE <br /> AIR-TO-SOILTRANSITIONS UQUID EPDXY/PSX 7DD(E-35.8) - TOE OF SLOPE (OWNEDBYOTHER51 <br /> --GD--- GAS DISTRIBUTION LINE(RETIRED) ❑M GAS METER © TREE -.._._ <br /> PRESSURE CONTROL FITTINGS LIQUID EPDXY(E-35.71,WAX TAPE(E-35.7) ---GS - TOP OF SLOPE RETIpEDGAS TRANSMISSION LINE <br /> --- GAS SERVICE LINE(RETIRED) ® ANODE <br /> TIE-INS/COATING TRANSITION$UQUID EPO%Y(E-35.31 OWNER -EP ® GAS DISTRICT REGULATOR <br /> BORED COATING SELECTIONS r._.._.._ FOREIGN GAS LINE EDGE OF PAVEMENT GASTRANSMISSIONLINE <br /> FC ® PG&E GAS MANHOLE ❑A DEEPWELLANODE - ----- - (TO BE REMOVED) <br /> MAIN UNE COATING I ARO APPUED OVER FOE(E-35.41 —1T— JOINTTRENCH FACE OF CURB COMPUTER AUTOMATED <br /> MINOR REPAIRS LIQUID EPDXIES E-35.2) —ET— ELECTRICTMNSMISSION LINE rBW ® GAS VAULT ® TEST STATE) CUT LINE(TO BE REMOVED) <br /> N <br /> TIE-IN WELDS I LIQUID EPDXIES(E-35.2) BACK OF WALK <br /> NOTES: —ED— ELECTRIC DISTRIBUTION LINE DASHED PAVEMENT MARKINGS GAS VENT AC© COUPON TEST <br /> ET ST STATION <br /> IIS�II EXISTING GAS DISTRIBUTION UNE <br /> B NEFRExOCONSTRULTIDNxoR SP.mArNGNWIRFMENR —ES— ELECTRIC SERVICE LINE UNPAVED ROAD W GAS VALVE Q COUPON TESTSTATION <br /> —ETON— ELECTRIC TRANSMISSION OVERHEAD I TI!I1 RAILROAD Q PG&E ELECTRIC MANHOLE ® EIECTIlOLV515 TEST STATION PROPOSED GAS DISTRIBUTION UNE <br /> INTERNAL CORROSION(IC) —EDON— ELECTRIC DISTRIBUTION OVERHEAD E ELECTNIC VAULT <br /> DESIGN&CONSTRUCTION REVIEW —T— TELEPHONE LINE MI ® POLE-MOUNTED RECTIFIER P0VWeW74 TOP OF GRADE <br /> ACCESS ROAD <br /> ICTHRUT YES NO —TO— FIBEROPTICLINE 0 UTILITY POLE(ELECTRIC) FD—CIM] DCI MITIGATION CABINET GASVALVE <br /> D (PER TD481OP-16) N/A N/A —TV— CAB TV UNE LAYNSOWN/IONGMPALT AREA m UTILITY POLE(OTHER) 8 POTHOLE i PIPE END CUT(SIDEI <br /> —SO— STORM DRAIN UNE JOINT POLE CRY/COUNTY MONUMENT <br /> (CION EN COMPLETED DESIGNATE) <br /> LAN ID DATE O • <br /> (CORROSION ENGINEER OR DESIGNATE) —SS— SEWER LINE . EXCAVATION/BELL HOLE ® PIPE END CUT <br /> —W— WATERLINE ® EXISTING ELECTRIC TOWER MONUMENT,SEE DESCRIPTION <br /> CORROSION ENGINEERING CORP RAS REVIEWED FLOW FLOW ARROW <br /> THISDESIGN DEIGN AND CONSTRUCTION <br /> ---11Nx— UNKNOWN UTILITIES O SAFETY ZONE LIMBS �, SURVEY CONTROL POINT <br /> NECESSARY IC DESIGN AND CONSTRUCTION • STORM DRAIN INLET <br /> CONSIDERATIONS.DOCUMENTATION OF N/A N/A C----7 CASING CL CENTERLINE . TIE-IN WELD <br /> THEREVIEW KAGE AND ARE IN . ENVIRONMENTALLY UTILITY MANHOLE � <br /> THEIOSIGN. GE AND INCORPORATED IN - - PROPERTY BOUNDARY SENSITIVE AREAS V_ MATERIAL OF RECORD ASSET <br /> I THIS DESIGN. ———- PG&E EASEMENT ® WATER METER <br /> i EDITS ROUTING NUMBER: - - — — ' <br /> TEMPORARY EASEMENT t6 BILL OF MATERIALS ASSET <br /> R/W FOREIGN RIGHT-OF-WAY <br /> INSTAUATIONTESTEDORINSPECTED AND <br /> NOTEON DRAWING. ............... ULTRAN$RIGHT-0F-WAY <br /> D <br /> ALL CORROSION LEVELS SATISFACTORY PER <br /> PG&E GAS UTIUTY STANDARD TD4181S. <br /> C QUALIFIED EMPLOYEE DATE Acronym Definition Acronym Definition Acronym Definition Acronym Definition Acronym Definition C <br /> CORROSION MECHANIC'S SIGNATURE IS (E) Existing DEG Degree HFW High Frequency Weld PKWY Parkway TEMP Temporary <br /> REQUIRED WHEN A CPA BOUNDARY IS (Pl Proposed DET DZI HPIE High Pressure Regulator PL Plastic TG Top of Grade <br /> WITH]N THE SCOPE OF THE PROJECT. AB Aggregate Base DFM DlsVibution Feeder Main HWY Highway PLC Pregrammagle Logic Controllers TT Top Tap <br /> ABN Abandon DI met <br /> Drainage Inlet 10 Inside Diameter PRUPF Procedure for the Resolution of TSP Transmission System Planning <br /> AC Asphalt Concrete DIA Deer III In-Une Inspection Unknown Pipeline Features TYP Typical <br /> API American Petroleum lreMute DIST Dindbution INV Invert PSI Pounds per Square Inch UG Underground <br /> APN Assessofs Parcel Number DPV Damage Prevention Volume IRR Irrigatiom PV Plug Valve USA UndergrourMService Alert <br /> APPROX Approximate OR DI:rbution Regulator JN Job Number PVMT Pavement UT UH <br /> ra-Sonic Test <br /> AVE Avenue DREG Di'a Regulator IP Joint Pole QTY Quandry V Valve <br /> ARC Abrasion Resistant Coating DSAW Double Submerged Arc-Welded IT Joint Trench R Radius VIF Verify in Field <br /> ASME American Society of Mechanical Engineers DWA Deep Well Anode L Une Number RCP Reinforced Concrete Pipe VOL Volume <br /> ASTM Ail It, Society for Testing Materials DWY Driveway LAT Latkude RD Road W Water <br /> BSCL Bell Bell ChM Ring E East W Lane ROM Roadway WT Wall Thickness <br /> BC Begin Curve EASE Easement WG Liquid Natural Gas REG 0.egulator WV Water Valve <br /> BD Blawdown EC End Curve LOC Location REL Relocate W/ With <br /> BEG Begin EL Elio— LONG Longitude REPL Replace W/0 Without <br /> BKF 9ackfill ELECT Elettric LT Leff REV Revision WP Work Procedure <br /> BLDG Building ELEV Elevation M Monitor RR Railroad <br /> BLVD Boulevard EM Electronic Marker MAOP Maximum Allowable Operating Pressure IT Right <br /> BM Bench Mark EMS Engineering Material Specification MAX Maximum PTE Route <br /> B BMp Best Management Practice ENGR Engineer MH Manhole R/W Right of Way B <br /> BOM Bill of Materials EP Edge Df Pavement MIN Minimum S South <br /> BR Bridge EQ Equation MISC Miscellaneous SAWH Submerged Arc-Welded Helical <br /> BiU British Thermal Units ERW Electric Resistance Welded MlV Mom Line Valve SAW]. Submerged Arc-Welded Longitudinal <br /> BV Ball Valve ESA Environmentally Sensitive Area M01 Method of Installation SCADA Supervisory Control and Data Acquisition <br /> BW Back of Walk ETS Electrolysis Test Station MON Monument SD Storm Drain <br /> CATS Compltter Auto mated Test Station ETW Edge of Tr2dWay MOP Maximum Operating Pressure SG Subgrade <br /> CCV Corrosion Control Volume F Filter MP Mlle Pont SHT Sheet <br /> Cl Cast Iron F&C Frame and Cover MSP Maximum Stopping Pressure SMLS Seamless <br /> CL Centerline FBE Fusion Bonded Epoxy MTR Meter SMYS Specked Minimum Yield Strength b <br /> CMP Corrugated Metal Pipe FC Face of Curb MW Working Monitor SPEC Specification <br /> CNG Compressed Natural Gas FDP Future Design Pressure MWP Maximum Working Pressure SS Sanitary Sewer <br /> CO County W Finished Grade N North $SAW Singk Submerged Arc-Weldetl GAS TRRNSMISSION <br /> CONC Comm FH fire Hydrant NDE Non-Destructive Examination ST Street ESTIMa NIB DESIGN <br /> COND Conduit FIG Figure NOP Normal OperafinR Pressure STA Station <br /> CP Cathodic Protection FL Flow Une NPC Non-Protected/Native Coupon STD Standard <br /> CPT Catch Point FUG Flange NTS Not to Scale STL Steel <br /> CROP Conditional Reduction of Pressure FWY Freeway OD Outside Pipe Diameter STPR Strength Test Pressure Report <br /> CTS Coupon Test Station GS Natural Gas Service GG Original Ground T Tied(Connected to System) <br /> CU Copper GS&S Gas Standard sand Specif ations OH Overhead TICE Temporary Construction Easement <br /> Culvert CULV GV Gate Valve P Pipeline TCP Traffic Control Plan <br /> 0 Depth GW Natural Gas Well P/L Property Une TD TechnicalD--.t <br /> A DE Dead End N HorlJontal PC Point of Curvature TOW T.D.Wllllamson /� <br /> DCUST Dirt,b,tion Customer HDD Horizontal Directional Drill PCF Pressure Control Fitting TEL Telephone <br /> WARNING: `^O-� PIPELINE-LEGEND&STAMP$ s <br /> T DDCUMEM CDMAINS NxIL Sm <br /> I�pM NtaL PROPRIETaRv L(2)49MD A-s 0.93 <br /> ox naris rNE soU B INSTALL(2)49'DWA's&RECTIFIER peo C-1415 <br /> xIc[tMnvAxv axDH � STOCKTON,SAN JOAQUIN COUNTY <br /> AD EXDEDfOR VSE ONLYm -'- <br /> UfHORrEEOPAOFKGASAND W.ado Delon. I tt>tiSlKutfrox TROLOA DvrT <br /> ELECTRIC Cque—EM—IS �.o GxASAN ELECTRIC <br /> SREETRD. S b T p4ER <br /> ANDm AGENTS. caulieloravandig. PACIFIC NF ANDELEC LIFO COMPANY 74026770 0 <br /> O PG&E m. REVISIONS SAN FRANCISCO,CALIFORNIA <br /> 1 2 d l 3 4 5 .i 6 1 7 818 !>w,,9 , 10 o a� <br />