Laserfiche WebLink
{ <br /> SITE INVESTIGATION WORKPLAN <br /> L.i <br /> Samples of soil and groundwater will be remanded to the custody of a California Certified <br /> Laboratory within twenty-four (24) hours of acquisition. Turnaround time for the actual analysis <br /> U will be approximately ten (10) working days from the date of receipt of the samples by the <br /> laboratory. Reporting will require approximately 10 business days to complete and a final report <br /> will be submitted to the SJCEHD approximately 10 business days following the receipt from the <br /> laboratory of the signed analytical reports. <br /> SIGNATURES OF ENVIRONMENTAL PROFESSIONALS <br /> This workplan has been prepared by the staff of Environmental Science Associates (ESA), and <br /> has been reviewed and approved by the "professionals" whose signatures appear below. <br /> The recommendations, specifications, and methodologies presented herein were prepared and <br /> presented within the parameters set by the California Regional Water Quality Control Board Tri- <br /> Regional Board Staff Recommendations, in accordance.with generally accepted practices at the <br /> r ` time that this workplan was prepared, and are true and correct to the best of our knowledge. No <br /> other warranty is expressed or implied. This workplan was prepared through the use of <br /> information and data provided by others. ESA in no way warrants the validity or accuracy of any <br /> information provided by these sources. <br /> Prepared by: <br /> L <br /> Crystal Ste ,REA <br /> Reviewed by: <br /> ,+ ter dson,R. . <br /> Environmental Science Associates 6 . University of the Pacific Site Investigation Work Plan <br /> June 2000 - 200252 <br />