My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MENDOCINO
>
1081
>
3500 - Local Oversight Program
>
PR0545548
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 10:00:49 AM
Creation date
3/16/2020 4:29:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545548
PE
3528
FACILITY_ID
FA0001143
FACILITY_NAME
UNIVERSITY OF THE PACIFIC
STREET_NUMBER
1081
Direction
W
STREET_NAME
MENDOCINO
STREET_TYPE
AVE
City
STOCKTON
Zip
95211
CURRENT_STATUS
02
SITE_LOCATION
1081 W MENDOCINO AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s` <br /> ATTACHMENT B <br /> HEALTH & SAFETY PLAN <br /> 1.0 PLAN SUMMARY <br /> 1.1 Site Location: University of the Pacific,former Physical Plant <br /> 1081 W. Mendocino Avenue <br /> LStockton, California <br /> 1.2 Personnel Responsibilities <br /> LProject Manager: Peter Hudson <br /> Project Health and Safety Manager: Peter Hudson <br /> Field Health and Safety Manager: Peter Hudson/Crystal Stech <br /> 1.3 Description of Work: <br /> Approximately five 5 soil borings will be advanced t the <br /> pP y ( ) g o soil-groundwater <br /> interface. One soil boring will be advanced in the center of the former tank pit <br /> with four additional borings advanced at locations approximately 15 feet from <br /> the tank pit corners. Direct-push soil sampling technology will advance the soil <br /> borings to desired depths. Groundwater samples will be collected once the <br /> borehole reaches the soil/groundwater interface. Groundwater will be allowed to <br /> enter the borehole through a screened, temporary sampling point placed by the <br /> h <br /> down-hole direct-push equipment. <br /> 1.4 Identified Hazards: <br /> Chemical: Low concentrations of petroleum hydrocarbon impacted soils <br /> Physical: Drill rig and equipment, hand tools, work intensive labor,fire <br /> C1.5 Monitoring Equipment: <br /> Photoionization Detector-H-Nu 101 <br /> 1.6 Protective Equipment Available: <br /> Hard Hats <br /> Steel-toed Boots <br /> Nitrile Gloves <br /> Glasses With Shatterproof Lenses <br /> Tyvek Coveralls (if needed) <br /> rrAir Purifying Respirators (if required) <br /> iw <br /> Environmental Science Associates 1 Universiry of the Pacific Site/nvesrigarion W_ ork Plan <br /> June 2000 200252 <br />
The URL can be used to link to this page
Your browser does not support the video tag.