Laserfiche WebLink
AGENDA <br /> SHOCKEY TRUCKING COMPANY- SITE REVIEW AND PROGRESS MEETING <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> Date: 22 January 2007 <br /> 10:00 am <br /> Attendees: EHD <br /> Advanced GeoEnvironmental, Inc. <br /> Shockey Trucking Company(Mr. Lee Shockey) <br /> OBJECTIVE: AGREED COURSE OF ACTION FOR REMEDIAT�I�O/N 4ND C OSURE <br /> .11 I. BRIEF SITE REVIEW KMA L <br /> tA <br /> A. Background 1 <br /> B. Pilot Studies Performed at Site Z g <br /> 1. Ozone Injection Feasibility Study <br /> 2. Batch Ground Water Pilot Study 3-�'4pr-- <br /> C. Monitoring Reports and Regulatory Comment <br /> 1. Discussion of interim remediation recommendations presented by AGE in <br /> First Quarter Monitoring Report 2005 to date. <br /> 2. EHD Regulatory Comment(Most recent issued 07 June 2002) <br /> IL DISCUSSION OF REMEDIATION OPTIONS <br /> A. Ground Water Interim Remediation <br /> I. Extraction, Treatment and Discharge <br /> a. July 1999 Pump Test <br /> b. Plume Migration Control <br /> C. Preliminary Feasibility Discussion with City of Ripon <br /> 2. In-situ Ozone Injection <br /> a. April to July 2003 Pilot Study <br /> b. Trend analysis for wells MW-2 and MW-4 <br /> B. Soil Remediation <br /> 1. Excavation <br /> a. Lithology- Structu4 Issues <br /> b. Seasonal Depth to Water <br /> C. Depth of HC-impacted Soil <br /> d. Current Property Usage <br /> 2. Soil Vapor Extraction <br /> a. Can Reduce Adsorbed TPH-d Concentrations <br /> b. Installation of SVE wells and pilot study required <br /> III. CONCEPTUAL AGREEMENT OF REMEDIAL ACTION <br /> A. Work Plan to Proceed <br />