Laserfiche WebLink
12 January 2007 <br /> AGE-NC Project No. 96-0232 <br /> Page 1 of 7 <br /> AGE Recommendations/EHD Correspondence to date: <br /> EHD: 10 October 1995: EHD directed a work plan to further define diesel contaminated soil under <br /> the former single wall tanks and piping. <br /> AGE: 14 November 1995: AGE submits Work Plan for Preliminary Soil and Ground Water <br /> Investigation for the installation of four soil probes. <br /> AGE: 09 February 1996: AGE submits Work Plan Addendum-February 1996 for the installation <br /> of four ground water monitoring wells. <br /> EHD: 07 March 1996: EHD approves AGE work plan(and addendum)for the installation of four <br /> additional monitoring wells to further define ground water contamination limits. <br /> AGE: 15 August 1996: AGE recommended in the quarterly report, the installation of three <br /> additional wells in the City of Ripon right-of-way. One well should be installed at north of <br /> MW-3; a second well should be installed northeast of MW-1, and the third well should be <br /> installed on the east side of the Highway 99 ramp. <br /> AGE: 22 November 1996: AGE recommended in the quarterly report for the delineation of the <br /> dissolved hydrocarbon plume with the collection of a minimum of four to five grab ground <br /> water samples.The samples should be collected to both delineate the hydrocarbon plume and <br /> provide information for the most effective placement of future ground water monitoring <br /> wells. AGE will provide a site specific work plan addendum for the additional well <br /> installation, upon the request of the PHS-EHD. Based on the current data the most likely <br /> placement of additional wells are as follows: one well should be installed north of MW-3; <br /> a second well should be installed northeast of MW-1 along Wilma Avenue and the third well <br /> should be installed on the east side of the Highway 99 ramp. <br /> AGE: 19 February 1997: AGE recommended in the quarterly report to further delineate the <br /> dissolved hydrocarbon plume with the collection of a minimum of four to five grab ground <br /> water samples.The samples should be collected to both delineate the hydrocarbon plume and <br /> provide information for the most effective placement of future ground water monitoring <br /> wells. Upon the request of the PHS-EHD, AGE will provide a site specific work plan <br /> addendum for the installation of additional wells. Based on the current data the most likely <br /> placement of additional wells are as follows: one well should be installed north of MW-3; <br /> a second well should be installed northeast of MW-4 along Wilma Avenue and the third well <br /> should be installed on the east side of the Highway 99 ramp. <br /> Advanced GeoEnvironmental,Inc. <br />