My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MILGEO
>
850
>
3500 - Local Oversight Program
>
PR0545550
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 11:29:53 PM
Creation date
3/16/2020 4:42:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545550
PE
3528
FACILITY_ID
FA0003973
FACILITY_NAME
SHOCKEY & SONS TRUCKING
STREET_NUMBER
850
STREET_NAME
MILGEO
STREET_TYPE
RD
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
850 MILGEO RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t AGENDA <br /> SHOCKEY TRUCKING COMPANY-SITE REVIEW AND PROGRESS MEETING <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> Date: 22 January 2007 <br />} 10:00 am <br /> Attendees: EHD <br /> z Advanced GeoEnvironmental, Inc. <br /> Shockey Trucking Company (Mr. Lee Shockey) <br /> OBJECTIVE: AGREED COURSE OF ACTION FOR REMEDIATION AND CLOSURE <br /> I. BRIEF SITE REVIEW <br /> A. Background <br /> B. Pilot Studies Performed at Site <br /> I 1. Ozone Injection Feasibility Study <br /> 2. Batch Ground Water Pilot Study <br /> C. Monitoring Reports and Regulatory Comment <br /> 1. Discussion of interim remediation recommendations presented by AGE in <br /> First Quarter Monitoring Report 2005 to date. <br /> 2. EHD Regulatory Comment (Most recent issued 07 June 2002) <br /> II. DISCUSSION OF REMEDIATION OPTIONS <br /> A. Ground Water Interim Remediation <br /> 1. Extraction, Treatment and Discharge <br /> a. July 1999 Pump Test <br /> b. Plume Migration Control <br /> C. Preliminary Feasibility Discussion with City of Ripon <br /> 2. - <br /> In situ Ozone Injection <br /> a. April to July 2003 Pilot Study <br /> b. Trend analysis for wells MW-2 and MW-4 <br /> B_ Soil Remediation <br /> I. Excavation <br /> a. Lithology - Structural Issues <br /> b. Seasonal Depth to Water <br /> C. Depth of HC-impacted Soil <br /> d. Current Property Usage <br /> 2. Soil Vapor Extraction <br /> a. Can Reduce Adsorbed TPH-d Concentrations <br /> b. Installation of SVE wells and pilot study required <br /> III. CONCEPTUAL AGREEMENT OF REMEDIAL ACTION <br /> A. Work Plan to Proceed <br />
The URL can be used to link to this page
Your browser does not support the video tag.