My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005167
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:43:19 PM
Creation date
3/17/2020 3:09:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005167
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 15 December 2000 <br /> • AGE-NC Project No 95-0103 <br /> Page 4 of 4 <br /> Following casing removal,the probe borings will be permanently sealed to prevent vertical migration <br /> of contaminants Soil borings shall be abandoned by backfilling with portland from the total depth <br /> to surface grade <br /> 32 GROUND WATER EXTRACTION TESTS <br /> Two drawdown pilot tests will be performed to evaluate feasibility of ground water extraction and <br /> to remove hydrocarbon mass through ground water extraction and to reduce ground water levels to <br /> enhance soil vapor extraction A downhole water pump will be utilized to induce a decline in static <br /> water level in the extraction well, pressure transducers will be deployed in surrounding wells to <br /> measure difference in ground water levels before well pumping and at set time intervals during well <br /> pumping <br /> A ground water test will be conducted to extract water from the vapor extraction well(VE-6), ground <br /> water level observations will be collected from two temporary ground water depth/elevation <br /> monitoring points, soil vapor extraction wells VW-1 and ASO-1, and possibly from ground water <br /> monitoring well MW-3 r <br /> A second ground water tests will be later conducted to extract water from the monitoring well (MW- <br /> 4) ground water level observations will be collected from one temporary ground water <br /> depth/elevation monitoring point, soil vapor extraction wells VW-7 and VE-1, and possibly from <br /> ground water monitoring well MW-1 <br /> The ground water will be extracted utilizing a submersible, 2-inch diameter Grundfos Rediflow self- <br /> priming downhole pump The ground water pumping rate will remain constant to achieve the <br /> optimum pumping rate for the greatest drawdown influence During the pumping, the estimated <br /> ground water extraction flow rate be one-gallon per minute The ground water extraction pilot test <br /> will be performed for 24 hours to allow for stabilization of ground water drawdown <br /> Purged ground water will be containerized in a 9 000-gallon Baker tank, four ' grab" ground water <br /> samples will be collected from the inlet to the Baker tank for analysis for TPI-I-g, BTEX and MTBE <br /> in accordance with appropriate method <br /> The purged ground water will be discharged into the City of Stockton sewer system pending <br /> regulatory approval or be transported to a suitable hazardous waste facility <br /> The duration of the initial drawdown pilot test will be a minimum of 24 hours The proposed <br /> drawdown pilot test will be designed to obtain general aquifer characteristics hydraulic conductivity <br /> transmissivity well effectiveness (efficiency) and drawdown at a steady pumping rate <br />
The URL can be used to link to this page
Your browser does not support the video tag.