My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005173
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 12:32:18 AM
Creation date
3/17/2020 3:15:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005173
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/20/2003 14 42 2094671118 AGE STOCKTON PAGE 16/16 <br /> . 10 March 2003 <br /> AGE-NC P eject No 95-0103 <br /> Page 2 of 2 <br /> 4 AGE will evaluate the performance of the ground water extraction system at the end of first <br /> quarter 2003 <br /> 5 Mr Knoll indicted that the ground flow direction at the site could not have been northeast <br /> at the site and the groundwater flow direction diagram presented on maps maybe inaccurate <br /> Additionally, wells MW-1 was to be re-sampled and wells MW-2 and MW-6 were to be <br /> removed from the sampling schedule <br /> 6 My Henderson advised that a mass calculation of the pre-ground water extraction process <br /> should be generated, allow for a mass percentage removal-analysis <br /> 7 Mrs Lagono indicted a closure-appeal to the State Water Resources Control Board could <br /> occur after the EHD approves closure and the Regional Water Quality Control Board - <br /> Central Valley Region denies closure <br /> 8 Mir Knoll indicted that continued quarterly ground water mowton g and <br /> operation/mamtenance of the ground water extraction and treatment system was required <br /> If you have any questions or require further information,please contact our office at(209)467-1006 <br /> Sincerely, <br /> Advanced GeoEnviron mental,Inc. <br /> William R Little <br /> Project Geologist <br /> Enclosures <br /> cc Mr Russell Chapin <br /> Mr James Barton,Regional Water Quality Control Board - Central Valley Region <br /> Ad*'bncedGftEnvironnmrtal,inn <br />
The URL can be used to link to this page
Your browser does not support the video tag.