My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0012995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:41:45 PM
Creation date
3/17/2020 3:49:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012995
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
---------------------------------——————--———————----- ——————-'——————————————————— -- } <br /> '01/62,,1900 09:46 FROM TO 12694656831 P.64 <br /> Mr. Russell Chapin <br /> October 16, 190 <br /> Page 4 <br /> In our opinioz4 this phase of the investigation would be best performed after { <br /> the results of sample analyses from tank removal are available,so that the P <br /> delineation program can address all known contaminant sources. Roger Foott <br /> Associates, Inc. could submit the Preliminary,Assessment Report within three weeks <br /> of tank removal. <br /> The results of the preliminary assessment investigation would be presented in <br /> a Problem Assessment Report,which will present the data used to indicate the extent <br /># of contamination,calculated groundwater surface elevation maps,soil stratigraphy <br /> data, preliminary aquifer parameters as necessary to define remedial alternatives, <br /> and a discussion of appropriate remedial alternatives. We would expect that the <br /> Problem Assessment Report would be completed within 3 to b months of approval of <br /> the Preliminary Assessment Report,depending on the extent of contamination and <br /> the need for offsite drilling. <br /> When the Problem Assessment Report is completed and accepted by <br /> regulatory agencies, a Final Remedial Pian(FRP)will be required after appropriate <br /> discussions with regulatory agencies and final field and laboratory tests. The FRP <br /> would present details of the remedial plan (number andlacement of wells,s, <br /> um in <br /> p P g <br /> rate,limits of excavation,vent lines,waste disposal, etc.). A schedule of <br /> implementation would also be presented. <br /> A copy of this work plan should be forwarded to Mr.Harlan Knoll of the San <br /> Joaquin County Public Health Services,Environmental Health Division,Post ice <br /> Box 2009,Stockton,California,95201. r <br /> i <br /> a <br /> i <br /> r <br /> ROGER <br /> FQDTT <br />
The URL can be used to link to this page
Your browser does not support the video tag.