My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005118
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
229
>
3500 - Local Oversight Program
>
PR0545566
>
ARCHIVED REPORTS_XR0005118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 10:44:37 PM
Creation date
3/17/2020 4:42:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005118
RECORD_ID
PR0545566
PE
3528
FACILITY_ID
FA0005479
FACILITY_NAME
MANTECA BEAN CO
STREET_NUMBER
229
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
229 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Second Quarter 1993 Status Report June 15, 1993 <br /> Golden Grain Company, Manteca Bean Facility, 229 Moffat Blvd , Manteca CA 4 <br /> TREATMENT SYSTEM SUMMARY <br /> System operations and maintenance for the quarter is summarized below <br /> 03/12/93 System not operating The thermocouple connection on the lead scubber needed <br /> tightening Correction made System operational <br /> 03/19/93 Vapor extraction system operational Lo-profile Air stripper (LO-PRO) not operating <br /> No problems found Meavy rains may have caused the shutdown System <br /> restarted <br /> 03/25/93 Vapor extraction system operational LO-PRO not operating Calcium flakes <br /> blocking the effluent water pathway Discharge line cleaned System operational <br /> 04/02/93 System not operating Power was interrupted on 03/31/93 by the local utility <br /> company Replaced lead scrubber thermocouple, pumped water from moisture <br /> knockouts and vapor lines, and restarted system System operational <br /> 04/09/93 System not operating Lead scrubber controller error Correction made System <br /> operational <br /> 04/16/93 Vapor extraction system operational LO-PRO not operating Plates of air stripper <br /> fouled Cleaned and replaced plates and restarted system System operational <br /> 04/19/93 System operational <br /> 04/29/93 System not operating Fuse of phase converter required replacement Restarted <br /> system without LO-PRO Vapor extraction system operational <br /> 05/07/93 Vapor extraction system operational Replaced fuse in phase converter and <br /> restarted LO-PRO System operational <br /> 05/14/93 System not operating, fuse blown Equipment malfunction in catalytic oxidizer <br /> during restart Shut down system until repair of the catalytic oxidizer can be <br /> completed <br /> During this quarter of system operation, there were no releases of untreated groundwater or <br /> untreated system vapors System shutdowns were planned or triggered by the system interlock <br /> which worked as designed to bring complete system shutdown in the event of equipment <br /> malfunction <br /> i <br /> 2379 R01 070 <br /> GROUNDWATER <br /> TECHNOLOGY,INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.