My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005130
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
229
>
3500 - Local Oversight Program
>
PR0545566
>
ARCHIVED REPORTS_XR0005130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:17:13 PM
Creation date
3/17/2020 4:49:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005130
RECORD_ID
PR0545566
PE
3528
FACILITY_ID
FA0005479
FACILITY_NAME
MANTECA BEAN CO
STREET_NUMBER
229
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
229 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
First Quarter 1995 Status Report 3 <br /> Golden Grain Company, Manteca Bean Facility,229 Moffat Blvd , Manteca,CA April&, 1995 <br /> ■ checking and calibrating the system lower explosive limit (LEL) meters <br /> ■ recording operational data and maintaining vacuum extraction blowers and vapor <br /> extraction system (VES) <br /> r checking and recording operational data for the air stripper and making adjustments as <br /> necessary <br /> ■ checking the condition of the catalytic water conditioner which minimizes fouling caused <br /> by the hardness of the water <br /> ■ performing a dally system operating parameters check via modem <br /> The soil vapor extraction and groundwater treatment systems ran continuously this quarter except <br /> during four occasions The following is a list of the days that the remediation system was not <br /> operational <br /> 01/01/95-01/11/95 The groundwater extraction system was non-operational because <br /> the relay from the phase converter to the air stripper blower failed <br /> A new relay had to be ordered prior to replacement The soli vapor <br /> extraction system continued to operate during the groundwater <br /> extraction system down time <br /> 01/21/95-01/25/95 The groundwater extraction system was non-operational because <br /> the discharge line became clogged with calcium carbonate chips <br /> from the air stripper trays The chips were removed, the air stripper <br /> plates were cleaned, and the system was restarted The soil vapor <br /> extraction system continued to operate during the groundwater <br /> extraction system down time <br /> 02/20/95-02/22/95 The fresh air bleed to the soil vapor extraction system was tripped <br /> for an unknown reason and the groundwater extraction system was <br /> shut down by the safety interlocks The system was restarted within <br /> two days of the system shutdown <br /> 02/26/95-02/28/95 A blown fuse in the catalytic oxidizer control panel caused the soil <br /> vapor extraction system to shut down and the groundwater system <br /> was shut down by the safety interlocks The fuse was replaced and <br /> the system was restarted within two days of the system shutdown <br /> During this quarter of operation, there were no releases of untreated groundwater or untreated <br /> system effluent vapors except for a 2 0 p g/L detection of xylenes in the effluent vapor during the <br /> February 22, 1995, sampling event System shutdowns were planned or occurred as a result of <br /> designed system safety interlocks, which shut down the remediation systems to preclude untreated <br /> . releases The xylenes detected in the catalytic oxidizer effluent was below the permit discharge limit, <br /> 0102no13 lox <br /> GROUNDWATER <br /> TECHNOLOGY, INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.