Laserfiche WebLink
P' <br /> d <br /> i <br /> ,a <br /> 25 <br /> line will be Laid In the <br /> trench. A 112 inch diameter electrical conduit will be placed in the trench to run a <br /> tank lull control switch from the product storage tank to the pump. <br /> 4.0 WORK PLAN FOR REMEDIATION SYSTEM INSTALLATION AND OPERATION mpteted. <br /> To complete the scope of work described in this report,the following <br /> tasks must be o Obtain permits from San Joaquin County :jealth Department for installation of the <br /> groundwater recovery well. <br /> 0 <br /> install groundwater pumping well, develop well, conduct 24 hour aquifer test, and <br /> analyze a sample of groundwater pumped from the well <br /> o <br /> With data obtained during the aquifer test,develop a final design of the groundwater <br /> remediation system. An additional pumping well may he required to achieve <br /> adequate hydraulic control over the groundwater plump. <br /> Obtain authority to construct the air emission cont,ol system from tt gas l aqui <br /> o <br /> County Air pollution Control District. Determine whether air stripper <br /> ontmi <br /> is necessary. <br /> O Obtain permits from the local building department to construct the treatment <br /> compound, inciuding the electrical portion. <br /> 1 <br /> ryO Purchase and install the treatment systenr as described in this report, subject to <br /> modifications dependent on the results of the pump test. <br /> performance of the system,and collect samples as required <br /> o Maintain the optimum <br /> nd for regulatory compliance. <br /> for system optimization a <br /> TECHNOLOGY,INC. <br />