wm <br /> 1 . <br /> w 26 <br /> 5.0 PROJECT SC ,EDULE <br /> Groundwater Technology is prepared to commence this work immediately. Three to six months <br /> and testing. Assuming successful receipt <br /> should be allowed for the necessary permitting,construction, <br /> of necessary permits and on-time equipment delivery,the treatment sy <br /> stem should be operational within <br /> ndwater treatmen' <br /> approximately 6 months from approval of this Final Remedial Plan. Th�,and seh a ateuphass petroleum.` <br /> system will depend on the successful removal of the unsaturated-zon P <br /> 6.0 LONGTERM MONITORING <br /> The treatment systems will be monitored at least as frequently as specified by the permitting <br /> agencies. It is expected that monthly monitoring of the influent and effluent hydrocarbon operation,sampling will <br /> to the air stripper and catalytic oxidizer will be required. During the first month of op <br /> be more frequent to optimize system performance. <br /> water table elevation will be measured monthly to verify that the pumping well is providing <br /> nitoring <br /> -' be <br /> hydraulic control over the TPM-G and benzene plumes. sacrum ^ences the <br /> ydrocarborells impaated <br /> measured monthly to verify that th-3 soH vapor extraction system in fluences .. <br /> v unsaturated zone. uarterl to monitor the <br /> Groundwater samples will be collected from selected site wells q Y <br />® effectiveness of the extraction systc,�l,and to document the effectiveness of the groundwater extraction <br /> sys`.am ai maintaining hydraulic control of the TPH-G and henzene plumes. <br /> i <br /> i ; <br /> (;ROUNt)%VATER <br /> TECHNol.OGY,INC. <br /> I <br />