My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012598
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
229
>
3500 - Local Oversight Program
>
PR0545566
>
ARCHIVED REPORTS_XR0012598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:48:13 PM
Creation date
3/17/2020 4:52:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012598
RECORD_ID
PR0545566
PE
3528
FACILITY_ID
FA0005479
FACILITY_NAME
MANTECA BEAN CO
STREET_NUMBER
229
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
229 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T' <br /> 3.4 <br /> GOI:DEN GRAIN COMPANY <br /> December 21, 1989 <br /> 202/799-5045.05 <br /> Health Services (DHS)-approved methods; and 1,2-dibromoethane <br /> (ethylene dibromide or EDB) by EPA Method 504. As proposed in <br /> the revised work plan, samples from borings on the south side of <br /> Moffat Boulevard (MW-10 and MW-14, the closest to the southern <br /> Pacific Pipeline that carries jet fuel to Castle Air Force Base) <br /> r.. <br /> were analyzed for TPH as jet fuel by modified EPA Method 8015 in <br /> addition to the parameters listed above. <br /> 3,3.3 Wall Construction_ <br /> All six borings were converted to 2-inch-diameter <br /> groundwater monitoring wells (MW-9 through MW-14) . The wells <br /> were constructed of 40 feet of 9.02o-inch, machine-slotted, <br /> • <br /> schedule 40 PvC ss-reen and 5 to 10 feat of blank PVC casing. The <br /> annular space was filled with Number 3 Lonestar sand from <br /> completion depth to 1 foot above the screened interval. <br /> Each well was finished with a 1- to 3-foot bentonite seal <br /> overlain by sand-cement grout to surface. DTI's experience in <br /> ures that the seals <br /> well installation using sand-cement gnat*} ass <br /> will be adequate. A locking cap and traffic-rated street box <br /> were installed to provide access to each well. Specific well <br /> construction details are noted in Appendix III. <br /> The wells were developed using a truck--mounted rig fitted <br /> with a 20-foot bailer and surger. Groundwater was removed from <br /> each well until the water was relatively clec.r of suspended <br /> sediments. Water produced during the development process was <br /> placed in DOT-approved 55-gallon steel drums, sealed, and left on <br /> site for disposal at a lacer date. <br /> i <br /> GROUNDWATER <br /> TECHNOLOGY,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.