Laserfiche WebLink
primer ordnance and Tactical Systems <br />EPA ID No.: CAD006626762 <br />Repo <br />a Col <br />will I <br />Depa <br />modi <br />4. C'Qrrertive <br />a. The <br />appy <br />a col <br />prop <br />and/ <br />sour <br />prac <br />the f <br />Draft Hazardous Waste Facility Permit <br />shall be developed in a manner consistent with the Scope of Work for <br />dive Measures Study provided by the Department. The Department <br />view the CMS Report and notify the Permittee in writing of the <br />ment's approval or disapproval, including any comments and/or <br />2tions, in accordance with Section IV.F of this permit. <br />epartment will evaluate corrective measure alternatives presented in the <br />ted CMS Report. Based on the evaluation, the Department may propose <br />active measure (or measures) for implementation at the Facility. The <br />;ed corrective measures(s) must: (1) be protective of human health <br />the environment; (2) meet the media cleanup standards; (3) control the <br />;(s) of releases(s) so as to reduce or eliminate, to the maximum extent <br />,able, further releases that might pose a threat to human health and/or <br />vironlment; and (4) meet all applicable waste management requirements. <br />b. The Department may modify this Permit to require the Permittee to implement <br />the proposed corrective measure(s). The permit modification will be done in <br />accordance with the requirements contained in title 22, Cal. Code Regs., <br />section 66270.41. As a part of the permit modification process, the public <br />will have an opportunity to review and comment on a draft of the modified <br />per it, the Department's proposed corrective measure(s) for the Facility, and <br />the apartment's justification for selection of such corrective measure(s) (the <br />"Sta ement of Basis"). <br />C. Fol; <br />rest <br />("R <br />con <br />add <br />imI <br />d. No, <br />self <br />the <br />aut <br />dire <br />ring the public comment period, the Department will prepare a formal <br />se to all public comments received regarding the Permit modification <br />)onse to Comments"). The Department may, as a result of the public <br />ents, issue the final modified permit, require the Permittee to do <br />mal work, or select an alternative corrective measure for <br />mentation at the Facility. <br />ng in this Permit shall limit the Department's authority to implement the <br />ed corrective measure(s) or to take any other appropriate action under <br />ws and regulations of the State of California, or any other legal <br />rity, including the filing of a civil action seeking a judicial order <br />:ina the Permittee to implement the selected corrective measure(s). <br />21 <br />