Laserfiche WebLink
09 July 2001 . <br /> AGE-NC Project No. 98-0520 <br /> Page 4 of 4 ' <br /> • Further site assessment to determine the lateral extent of petroleum hydrocarbon-•im_pacted <br /> ' and TBA-impacted ground water. <br /> • Installation of additional ground water monitoring wells to define the plume of impacted ; <br /> ' ground water. <br /> • Continued quarterly ground water monitoring. <br /> ' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> ' environmental consultants practicing in this or similar localities.The findings were based upon field <br /> measurements and analytical results provided by an independent laboratory_ Evaluations of the <br /> geologic/hydrogeologic conditions at the site for the purpose of this investigation are made from a <br /> ' limited number of available data points (i.e. ground water samples) and subsurface,conditions may. . <br /> vary away from these data points. No other warranty, expressed or implied, is made as to the <br />` professional recommendations contained in this report. <br /> 1 <br /> Advanced GeoEnvironmental Inc. ' <br />