Laserfiche WebLink
' 18 April 2001 <br /> ,AGE-NC Project No. 98-0520 <br /> • Page 4 of 4 <br /> • Further site assessment to'determine the lateral extent of petroleum hydrocarbon-impacted <br /> tand TBA-impacted ground water. <br /> • Installation of additional ground water monitoring wells to define the plume of impacted <br /> ' ground water. <br /> • Continued quarterly ground water monitoring. <br /> 6.0.. LIMITATIONS <br /> ,• Our professional services were performed using that degree of care and skill ordinarilyexercised b <br /> Y <br /> environmental consultants practicing in this or similar localities.The findirigs were based upon field <br /> measurements and analytical results provided by an independent laboratory. Evaluations of the <br /> geologic/hydrogeologic conditions at the site for the purpose of this investigation are made from a <br /> limited number of available data points(i.e, ground water samples) and subsurface conditions may <br /> tvary away from these data points. No other warranty, expressed or implied, is made as-to the <br /> professional recommendations contained in'this report. <br /> 1 l <br /> Advanced GeoEnviironmental,Inc. <br /> 1 <br />