Laserfiche WebLink
TABLEA <br /> SOIL AND GROUND WATER CORRECTIVE ACTION ALTERNATIVES <br /> Bob's Muffler Shop <br /> 466 Moffat Boulevard, Manteca, California <br /> Estimated Costs Typical Monitoring Estimated <br /> Method Advantages Disadvantages (incl. Monitoring <br /> and Maintenance) Requirements Duration <br /> Ground Water •Rapid reduction in high •High volumes of extracted water $30,000 to$50,000, Quarterly or monthly May vary; <br /> Extraction concentrations•Prevent spreading will require disposal•Typically set-up,plus treatment monitoring;analysis of typically 18 to <br /> of plume. difficult to achieve cleanup goals and disposal of water extracted water. 36 months. <br /> Section 7.1. Usually not cost effective for larger <br /> plumes-Equipment can be costly. <br /> In-situ Air Sparging •Cleanup technique compatible •Initial equipment/design costs can $15,000 to$25,000 Monthly ground water 18 to 24 months <br /> with site conditions-Combines be costly•capitol Impacted ground plus extraction depth measurements;. <br /> Section 7.2. well with SVE•Readily available water extends off-site, monitoring,depending monthly sample <br /> equipment•Site,conditions are upon treatment period. collection. <br /> conducive for IAS treatment•Little <br /> equipment maintenance required. <br /> I _ i <br /> In-situ •Relatively simple design and •Usually no immediate reduction in $70,000 to Monthly ground water I2 to 18 months <br /> Bioremediati6n application process•Little or no hydrocarbon concentrations• $95,000 total cost and vapor sampling; <br /> (Ground Water) maintenance required. Remediation controls difficult to quarterly monitoring; <br /> implement-Regulatory acceptance microbiological analysis . <br /> Section 7.3. difficult to obtain,-Waste discharge of samples. <br /> permits sometimes required. <br /> Natural Attenuation -.Lower costs than most active •Not effective for higher $6,000 to$20,000 Quarterly ground water Unknown <br /> remedial alternatives•Minimal contaminant concentrations• annually monitoring , <br /> Section 7.4. disturbance to the site•Potential Migration of contamination may <br /> use below structures. occur•Longer time frame than <br /> active remediation�May not achieve <br /> cleanup levels within reasonable <br /> length of time•Not generally <br /> permitted when free product is <br /> resent. <br /> Advanced GeoEnviron mental,Inc. <br />