Laserfiche WebLink
.v <br /> r <br /> ti <br /> SHERWOOD LABS CORPORATION <br /> Quality Control Program <br /> Page : 2 <br /> 7• Interlaboratory comparison studies when available, <br /> completion of the initial validationProcesswhen <br /> Project data is compiled into a formatted data is camPlete all <br /> review. Included in the contentsof the Packeta are ge for Peer <br /> liabilit <br /> applicable to method completeness and rP y, comments <br /> MONITORINGOFMETHOD PERFORMANCE <br /> _ ` <br /> 1 • REAGENTS AND GLASSWARE <br /> Method and reagent bl&nks verify that interferences caused b <br /> contaminants in water, solvents, reagents or glassware used in <br /> � the method y <br /> are known and accounted for during the <br /> Procdata reduction. A reagent blank is analyzed Whenever asnewf <br /> reagent source is used for extraction or <br /> carried through each step of the analyticalean-up. Blanks are <br /> Process. <br /> a• All solvent and reagent information including date of <br /> receipt, SUPWlier and the assigned unique lab <br /> entered into a standards log nook. oratory ID is <br /> 2. STAND, <br /> A►iD5 <br /> I <br /> Standards are used to calibrate instruments and to monitor the <br /> long term reliability of the analytical results. <br /> standards are Prepared from certified working <br /> sources supplied by EPA or chemical su pj�mary reference <br /> PF iers. <br /> a. Complete preparation information for <br /> including each standard <br /> teclludingnPrimaonssource, <br /> ou c ,Supplier, date of <br /> unique laboratory P e paration and the preparation, <br /> ed <br /> book. <br /> Y ID is entered into the standards log <br /> b. when a new standard source or stock soli <br /> tion <br /> validation of working dilutions must be made is Prepared <br /> acceptance for use. Previously evaluated batchesrior ato <br /> re used j <br /> as a basis for comparison. Side-by--side analysis of two <br /> z� separate batches must <br /> Of the reported_-value.Y�Fad-lu eta meet thidifferences not srequirementn <br /> - --- -.-- -will result <br /> in the rerunning of validation- - -- - --- <br /> 5�6 <br /> analyses. In <br /> the event that the rerun batch fails to meet <br /> � 2 criteria standards must be Performance <br /> } re-Prepared. y. <br />