Laserfiche WebLink
• itatg '� <br /> 1 Building Department. The Building Department will then review the plans and issu <br /> 2 a permit. The complete construction process will take approximately three to four <br /> 3 months. It would not be practical to perform construction during the wet season <br /> 4 because of the necessity to drive heavy equipment onto the site. In addition, the wor <br /> 5 on the retention ponds and berms should proceed first since the primary wast <br /> 6 retention system at dairies is a waste retention pond-type system. The waste retention <br /> 7 pond system is the most critical element of waste control at any dairy. <br /> 8 I declare under penalty of perjury that the foregoing is true and correct. <br /> 9 EXECUTED on this 3 j� day of October,2000, at Tracy, California. <br /> 10 <br /> 11 DAN R. SCHACK <br /> 12 <br /> 13 <br /> 14 <br /> is 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> 26 <br /> • 27 <br /> 28 <br /> 6 <br /> Declaration of Dan R.Schack In Support Of Objections to Plaintiffs Proposed Statement of Decision <br />