My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2731
>
2900 - Site Mitigation Program
>
PR0537457
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 2:59:56 PM
Creation date
3/19/2020 3:41:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537457
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0021545
FACILITY_NAME
SAN JOAQUIN RTD/SARDEE VACANT LOT
STREET_NUMBER
2731
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
ST
City
STOCKTON
Zip
95205-4718
APN
15702002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2731 E MYRTLE ST STOCKTON 95205-4718
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attorney-Client Privileged <br /> The depth to groundwater measured to existing grade will be recorded. It <br /> should, however be noted that groundwater levels may not be completely <br /> stabilized due to the short time open. The groundwater will also be checked for <br /> presence of separate phase product. <br /> • The bailer with groundwater samples in it will be brought back to the surface and <br /> carefully placed in laboratory supplied/pre-cleaned sampling jars. <br /> Any and all required sampling preservatives will be pre-supplied by the <br /> laboratory. <br /> • Each sample will be collected with minimum headspace, sealed, labeled with a <br /> unique sample number, logged onto the CCF and placed inside the dedicated <br /> cooler and transported to PET. All applicable sample hold times will be strictly <br /> observed by PET. <br /> • Upon completion of the borehole sampling, each borehole will be sealed with a <br /> cement grout, placed from the bottom to the top of each boring per San Joaquin <br /> Environmental Health Department (SJCEHD) requirements. A representative of <br /> the SJCEHD may witness portion of the borehole sealing. <br /> • Boring 1.1: (B-1): Across of the Fence from Sardee's Paint Booth <br /> 1 soil sample at the top of the soil and ground water interface and 1 ground water <br /> sample to be analyzed for TPH, BTEX/MTBE, solvent scan (1,2 DCA, etc), and <br /> heavy metals. <br /> • Boring 1.2: (B-2): <br /> 1 soil sample at the soil and ground water interface and 1 ground water sample <br /> to be analyzed for TPH, BTEX/MTBE, solvent scan (1,2 DCA, etc) and heavy <br /> metals. <br /> Page 7 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.