My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2900 - Site Mitigation Program
>
PR0517531
>
COMPLIANCE INFO_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2020 5:55:33 PM
Creation date
3/20/2020 3:00:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
CASE 1
RECORD_ID
PR0517531
PE
2950
FACILITY_ID
FA0013493
FACILITY_NAME
CHEVRON SERVICE STATION #201761
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIERRA <br /> STANDARD OPERATING PROCEDURE <br /> SOIL SAMPLING <br /> The following describes sampling procedures used by SES field personnel to collect, <br /> handle, and transport soil samples. Before samples are collected, careful consideration is given <br /> to the type of analysis to be performed so that precautions are taken to prevent loss of volatile <br /> components or contamination of the sample, and to preserve the sample for subsequent analysis. <br /> All drilling and sampling equipment is steam-cleaned between boreholes to prevent cross- <br /> contamination. The sampler is washed with an EPA approved detergent (such as liquinox or <br /> trisodium phosphate)between sample collection. Collection methods specific to soil sampling are <br /> presented below. <br /> Soil samples are collected at pre-specified depth intervals or at a sediment/lithologic <br /> change for hydrogeologic description and possible chemical analysis. Samples are collected using <br /> a modified California split-spoon sampler lined with 2- or 2.5-inch I.D.x 4- or 6-inch long steam- <br /> cleaned or new brass tubes. The sampler is lowered into the borehole and driven 18-inches,using <br /> a 140-pound hammer. The drilling contractor provides the SES field personnel with the number <br /> of blows required to drive the sampler for each 6-inches of penetration. <br /> The sampler is then extracted from the borehole and the middle or bottom brass tube is <br /> carefully removed for possible analysis. The soil material is immediately trimmed flush with the <br /> tube ends, and sealed with Teflon tape beneath polyethylene end caps. The caps are hermetically <br /> sealed to the brass tube with duct tape. The sample is then labeled to include the date, boring <br /> number, depth of sample, project number, SES, and the SES field personnel's initials. The <br /> samples are put into a plastic "zip-lock' type bag and placed into an ice chest maintained below <br /> 4°C with blue ice or dry ice, for transport under chain of custody to the laboratory. The chain-of- <br /> custody form includes the project number, analysis requested, sample ID, date analysis and the <br /> SES field personnel's name. The form is signed, dated and timed by each person who yields or <br /> receives the samples beginning with the field personnel and ending with the laboratory personnel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.