Laserfiche WebLink
PERSONNEL PROTECTION PLAN <br /> Engineering Controls <br /> Deac Ergirwadng Cornrola used as pert of Personrel Protection Plan: <br /> Task(s) 2 <br /> Dust suppression with water on cuttings. <br /> Administrative Controls <br /> Deecdbe Adminamettva corarols used s Part of Parmmal Ptetectkln Plan: <br /> Task(s) 2 <br /> All personnel will have 40-hour +8-hour OSHA HAZWOPER training, participate in medical surveillance program and fit test <br /> program. All personnel will read and adhere to this HASP. <br /> Personnel Protective Equipment <br /> Action Levels for Changing Levels of Protection. Define Action Levels for up or down grade for each task: - <br /> Task(s) 2 <br /> Monitoring of breathing zone with PID: <br /> • Level D: 0 RRU above background. <br /> • Level C: RRU above background (sustained greater then 10 minutes), or if 0 — 1 ppm benzene(IF <br /> SUSPECTED with Draeger tubes. <br /> • Stop work if greater then : . RRU above background or greater than 1 ppm benzene. <br /> Description of Levels of"Protection <br /> Level D Level D Modified <br /> Taskls): Task(s): <br /> ® Head (hard hat) ® Head <br /> ® Eye and Face ® Eye and Face <br /> ® <br /> Hearing g <br /> (if necessary) ® Hearin (if necessary) <br /> ❑ Arms and Lags Only ❑ Arms and Legs Only <br /> ❑ Whole Bod Appropriate Work Uniform ® Y (Tyvek) <br /> ® Hand — Gloves (leather, nitrile surgical) ❑ Apron <br /> (nitrile surgical) <br /> ® Foot — Safety Boots ® Hand — Gloves <br /> ❑ Fell Protection ❑ Gloves <br /> ❑ Flotation ❑ Gloves <br /> ❑ Other ❑ Foot — Safety Boots <br /> ❑ Boots <br /> ❑ Boots <br /> Corporate Health and Safety Page 14 of 36 <br />