My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:02:27 PM
Creation date
3/23/2020 3:57:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 28, 1992 <br /> 92-1177101 <br /> NORCAL Stockton Scavenger Association <br /> �+ Attention Mr. Paul Moline-11i <br /> Subject: WORK PLAN - Soil Sampling and Analysis._ <br /> Stockton Scavenger Association <br /> Stockton, CA <br /> r Page 3 -. .- <br /> ■ Task 30 - Field Activities <br /> The scope of work involves drilling and sampling five exploratoryborings at the <br /> subject site. Locations of the proposed boring sites are identified in Drawing 2. <br /> The borings will be drilled to an approximate depth of 30 feet. Soil samples will be <br /> collected from each boring at depths of 14 and 25 feet, making a-total of. 10-soil <br /> samples. Screening of samples in the field with a flame ionization detector (FID) <br /> will be performed-to provide an assessment of the vertical-extent of volatile organic <br /> compounds in the boring. In addition to soil samples, groundwater samples, <br /> comprising.of a_total of five samples, will be obtained from each boring with the use <br /> of a hydro-punch. Use of the hydro=punch provides a one time groundwater sample <br /> without the added expense and labor of installing a monitoring well. Upon <br /> completion of the sampling, all borings will be .sealed to the surface with a ce- <br /> ment/bentonite mixture. <br /> The field crew will utilize Level D safetyprecautions. In-the event that significant <br /> vapors are detected on site; the project manager or his designee will upgrade safety <br /> precautions as deemed appropriate. .Health and safety guidelines are detailed in the <br /> Health-and Safety Plan;-Appendix A. <br /> Cuttings produced from drilling. will be placed on existing soil. stockpiles -that <br /> resulted from the previous underground storage tanks excavation. <br /> �} ■ Task 60 - Chemical Anal <br /> Analysis of groundwater and soil samples will be performed.in a State of California <br /> certified laboratory. Soil samples will be analyzed for total petroleum hydrocarbons <br /> (gasoline and diesel) (EPA Modified,.Method. 8015) and-BTEX (EPA Modred <br /> Method 8020). -Groundwater samples -will-also- be submitted for analysis of EPA <br /> Method 8015 and EPA Method 8020 Normal turn around-time for laboratory work <br /> is two weeks. <br /> ■ Task 70 - Data-Evaluation <br /> Upon receipt of the laboratory results, MARK:personnel will format them into <br /> tabular and graphical presentations. With these-formats,-evaluations will be made. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.