Laserfiche WebLink
October 28, 1992 <br /> 92-1177101 <br /> NORCAL Stockton Scavenger Association <br /> Attention Mr. Paul Molinelli- <br /> _ Subject: WORK PLAN: . - Soil Sampling and Analysis <br /> Stockton Scavenger Association <br /> Stockton, CA - - <br /> Page 4 <br /> ■ Task 80 - Reporting <br /> At the conclusion of sampling and analysis, MARK will prepare and submit a <br /> Report of Sampling and Analysis to NORCAL/Stockton Scavenger Association. <br /> This report will include an introduction, brief background and description of the <br /> scope of work, laboratory results, conclusions and recommendations. Laboratory <br /> results will be presented in tabulated and graphical format. for evaluation. <br /> Conclusions and recommendations, will be supported by data evaluation - and <br /> regulatory guidance. <br /> Schedule. <br /> Field work can be completed in two work days. Laboratory work requires two weeks. <br /> for completion. The Report of Sampling and Analysis will be submitted for review one <br /> month thereafter. A detailed schedule is presented in Figure 1. <br /> Closure <br /> We appreciate the opportunity to present this Work Plan. If you have any questions <br /> please call Mr. Robert S. Spare or Mr. Thomas E. Lindemuth, P.E. or the undersigned. <br /> Sincerely, <br /> The Mark Group, <br /> Engineers.& Geologists, Inc. <br /> fDavid K. Rogers, P.E.,. E.G. - <br /> �•+ Principal _ <br /> DJL:sed <br /> SSQ.WP <br /> Attachments: Drawing A - Site Location Map <br /> Drawing B - Sampling Site Location Map <br /> Figure _1 Project Schedule <br /> Appendix.A - Health and .Safety Plan <br /> cc: Mark B. Zygutis <br /> 1.»r <br /> I <br />