Laserfiche WebLink
1 <br /> � t <br /> i <br /> ! Mr. Harlin Knoll <br /> February 5, 2009 <br /> Page 2 <br /> be analyzed for TPHd by US EPA Method 8015B. The December 18, 2008 Work Plan did not include <br /> i toluene, ethylbenzene, and total xylenes in the analytical list. <br /> i <br /> Soil Vapor Survey <br /> AECOM proposes to modify the location of vapor.sampling point V-1 from near the dispenser island <br /> excavation to the vicinity of MW-1, as shown on Figure 2. This modified location is closer to potential <br /> vapor intrusion receptors in the office building. f <br /> Remarks/Signatures <br /> If you have any questions regarding this project, please contact Mark Capps at(916) 362-7100. <br /> Sincerely, <br /> AECOM Environment <br /> W-� <br /> f <br /> Chris Drabandt, GIT#115 Mark Capps, PG#6561 <br /> Project Geologist Senior Project Manager <br /> cc: Ms. Amy Dietz, Norcal Waste Systems, Inc. <br /> Mr. Jim Barton, Central Valley Water Board <br /> Figures <br /> 1) Site Location Map <br /> 2) Site Map <br /> i <br /> I <br /> i <br /> AECOM Environment AECOM <br /> R <br />