My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:02:27 PM
Creation date
3/23/2020 3:57:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TH <br /> LMARK - <br /> ROUP - <br /> - Site-Specific Health and -Safety, Plan <br /> ENGINEERS E •GEOLOGISTS, INC. I'' <br /> - ENVIRONMENTAL MONITORING EQUIPMENT <br /> Check if - <br /> Required Type of Equipment When Recorded, _ _ Where Recorded <br /> Combustible Gas Meter_ - - _•. _ - _ _ _ <br /> Oxygen Monitor - - <br /> - - <br /> I <br /> HNU <br /> X OVA = - During the drilling and-sampling, soil samples will be screened <br /> -_ - <br /> hewill <br /> twice borehole. This minimizete and a "gross assessment of the vertical extent <br /> of <br /> during sam lin <br /> soils potentially impacted by volatile organic compounds In <br /> addition;will be <br /> at-the_ downwind edge of exclusion <br /> _ - <br /> zone during drilling and sampling on an hourly. basis. <br /> Field GC <br /> Scintillometer <br /> Gieger Counter <br /> Colorimetric Tubes <br /> Dosimeters/Film Badges <br /> Other <br /> = COMPOUNDS AND CONCENTRATIONS ` . -ACTION-LEVELS - <br /> Project action levels are determined-by the potential-total petroleum hydrocarbons (TPH) levels that may be -. <br /> encountered during sampling. -Action-levels:will be determined-using a flame ionization detector. (FID) at-the <br /> previously described sampling-points.- The-determined action levels':-concentrations-and corresponding courses of <br /> action are as follows: : <br /> �++ 1 When air readings are found to be at or above 50 parts per million----(ppm) half face respirators with <br /> organic vapor cartridges'will be worn;by_all personnel r <br /> 2. At concentrations of hydrocarbons in-air-of-500 ppm personnel will move away from the site and"7 <br /> further -_ evaluation of the site_ and procedures will become necessary. It is not expected-that this <br /> action level will be reached-at any.time during the project: - <br /> 3 Third level of action.would address the general public in the vicinity.-of-the project site. The potential- _ <br />-- for this level of action-is extremely unlikely. <br /> -- - - 1 <br /> - - <br /> -Page- <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.