My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:02:27 PM
Creation date
3/23/2020 3:57:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MRITHE <br /> MARK <br /> GROUP <br /> ENGINEERS 3-GEOLOGISTS, INC. - p Site-S eeific Health and Safe Plan_ <br /> -- - = tY <br /> :ONSITE CONTROL MEASURES = <br /> AUTHORITY <br /> Mr.Ken Simas has been designated.to coordinate access control and.site:security. A safe <br /> perimeter around the . drilling zone has'been established as•follows <br /> When work is being conducted; a 50 foot perimeter around-the drill rig will regulating.access. ..No unauthorized <br /> persons will be allowed within the vicinity of the work site._Restrictions related to visitors and public access are =- <br /> specified in Section 8.2 and 8.3 of The MARK-Group's Master Health and Safety Plan No person shall be, <br /> admitted to the work site unless they are MARK project personnel, authorized contractor personnel, or visitors with <br /> legitimate business related work. All personnel given access to the work site.must-have-currently up to date iealth- <br /> and safety training as specified by-29 CFR 1910.120. - <br /> No unauthorized personnel should be within this area.. <br /> COMMAND POST/STAGING AREA <br /> rThe onsite Command Rost and Staging Area have been established at: _ - <br /> _ :Not applicable <br /> The prevailing wind conditions are see site description section <br /> The Command Post and Staging Area are upwind from the._: not applicable _ zone:. <br /> CONTROL BOUNDARIES <br /> Control-Boundaries have been established and the Exclusion:Zone,'Decontamination Zone, and-Support Zone are <br /> designated.on Drawing 2.of the projects-.Work-PLan. _ <br /> An additional exclusion barrier will be-installed around the perimeter"of the:excavation pits:Jhe-purpose;of this <br /> boundary is to prevent-accidental entry11 t6!the.Pits. <br /> • These boundaries are identified-by; <br /> Boundaries will be identified by:cordoning tape: <br /> ATTA -MAP.-OF <br /> CH .CONTROL AREAS': <br /> -- - - - - <br /> _ <br /> page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.