Laserfiche WebLink
TABLE OF CONTENTS (Continued) <br /> 6 0 RECOMMENDATIONS . . . . . . . . . . . . . . . . 6-1 <br /> 6.1 Soil Impacts . , . . . . . . . . . 6-1 <br /> 62 Groundwater Impacts . . . . . . . • • • • • . , . 6-1 <br /> List of Tables, <br /> Table 2-1: North Pit Confirmation Analytical Results <br /> Table 2-2 South Pit Confirmation Analytical Results <br /> Table 2-3• Fuel Dispenser Island Confirmation Analytical Results <br /> Table 3-1 Treatment Pile Confirmation Analytical Results <br /> Table 4-1 Groundwater Analytical Results <br /> List of Drawmn s <br /> Drawing 1-1• Site Location Map <br /> Drawing 1-2 Site Map <br /> Drawing 1-3 Potential Groundwater Surface <br /> • Drawing 2-1 Excavation Sampling Locations <br /> Drawing 3-1 Treatment Pile Construction Design <br /> Drawing 3-2 HEVE/TO Schematic <br /> Drawing 3-3 In-Situ Vapor Extraction/Reinjection System <br /> Drawing 3-4 Treatment Pile Confirmation Sampling Locations <br /> Drawing 4-1• Isoconcentrations Contour - TPH-g <br /> Drawing 4-2 Isoconcentrations Contour - TPH-d <br /> Drawing 4-3• Isoconcentrations Contour - Benzene <br /> Appendices <br /> APPENDIX A Bornng and Well Construction Logs <br /> APPENDIX B• Laboratory Reports and Chain-of-Custody Records <br /> APPENDIX C- MARK Quality Assurance Project Pian <br /> APPENDIX D Water Purging and Sampling Logs <br /> FASCLOSE CON -iv 92-1177102 36 <br />